CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Progressive Design-Build Services (Request for Qualifications)
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
Description: DESIGN-BUILD services for public safety facility. Phase I - Schematic Design and Project Validation: Provide complete Schematic Design ("SD") services to include: a. Project coordination b. Conferences with staff, Town Council, and other required stakeholders c. Zoning compliance i.e. plat requirements d. Exterior and interior design of the building e. Meetings with Town regarding water and sanitary sewer utilities and storm water management plan requirements to meet the 25-year 3-day storm event design criteria f. Building Code analysis includes discussion with Town officials g. Diagram space requirement; see outside link.
City · FL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityWA
Jul 28, 2026
Closes
Aug 24, 2026
Design build of new teen center, new teen center is expected to be 20,000-25,000 SF.
CityNC
Mar 23, 2026
Closes
Sep 3, 2026
DESIGN-BUILD: design and construct the wtp expansion project. Based on recent water planning evaluations, cltwater has identified the need for several improvements to address future water capacity needs. These improvements include expansion of the lee s. Dukes wtp along with various improvements and upgrades to the distribution system, particularly in the 978 zone.
CityKY
Aug 7, 2026
Closes
Aug 21, 2026
DESIGN-BUILD entities interested in providing complete design and construction services for a new ashland fire department storage facility. The project generally consists of the design and construction of an approx. 120-foot-wide by 65-foot-deep pre-engineered metal building for use as a Fire Department storage facility.
California State University Fresno
Higher EducationCA
Aug 17, 2026
Closes
Sep 24, 2026
The Trustees of California State University, Fresno are seeking a single design-build contractor for The Forge — Ag-Tech, Bio-Tech, and Engineering Innovation Center in Fresno, California. The work includes design, engineering, permitting, adaptive reuse and renovation of the existing Forestry Building, construction, commissioning, and closeout. The mandatory pre-bid conference and site visit are scheduled for September 2, 2026, and submissions are due September 24, 2026 at 2:00 PM PDT.
Procurement and program contacts connected to Town of Southwest Ranches.