Professional Design Engineering Services for Safe Streets and Roads for All (SS4A) Implementation Grant Plan
Description: The City of San Bernardino seeks a qualified consultant to provide professional design engineering services for SS4A-funded roadway safety improvements at five locations: Highland Avenue at Eucalyptus Drive, 30th Street, Meridian Avenue, Kendall Drive, and Lynwood Drive.
Services include preliminary engineering, NEPA documentation, assessment of right-of-way needs and utility impacts, and project reporting and outcome assessment. Option Phase 1 includes final engineering design, subsurface utility engineering, utility relocation, and right-of-way acquisition support as needed.
Proposed improvements include pedestrian crossings, bicycle facilities, traffic control and signalization, pavement friction treatments, lighting upgrades, and sidewalk gap closures.
Please see solicitation documents for full details.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
From the first pre-RFP signals to the published RFP and its files.
Budget
477 days before RFP
The adopted budget records a design-stage safety action plan for Baseline Street from Meridian Avenue to Tippecanoe Avenue with federal and local funding listed.
See 2 sourcesHide sources
Planning Study for Safety and Roads Baseline Project Funding and Expenditure Detail Project Name: Planning Study for Safety and Roads Baseline Program Number Ward Project Status CIP type CIP Project # 9108 All Design Streets TC24-020 Project Description Development of a comprehensive safety action plan that will identify the most significant roadway safety…
The City is conducting a Safe Streets and Roads for All pedestrian and bicycle-safety study of a five-mile Baseline Street corridor to identify improvements and pursue state and federal funding.
See sourceHide source
The city is seeking input for baseline improvements. Um, safe streets, for those that do or don't know here, safe streets and roads for all is a pedestrian and allaround um, bike safety um, study that has the cities are eligible to public works is conducting the traffic study here of a fivemile stretch of baseline street between Typicano and Mer Meridian.…
Mayor And City Council Of San Bernardino Acting As The Successor Agency To The Redevelopment Agency Of The City Of San Bernardino The San Bernardino City Housing Authority And As The San Bernardino Joint Powers Finance Authority Joint Regular Meeting
The City Council adopted the Baseline Street SS4A Safety Study Report and authorized its use for future transportation safety projects and grant applications.
See sourceHide source
22. Accepting the Baseline Street Safe Streets and Roads for All (SS4A) Safety Study Report (Wards 1,2, 6) Recommendation: Regular Meeting Minutes June 17, 2026 Mayor and City Council of the City of San Bernardino Page 12 It is recommended that the Mayor and City Council of the City of San Bernardino, California, adopt Resolution No. 2026-084 of the Mayor…
Mayor and City Council Closed Session and Regular Meeting
San Bernardino City Council approved acceptance of $5,279,592 in SS4A Implementation Grant funds and a $1,319,898 local match for the Revitalizing Roadway Safety Project.
See sourceHide source
28. Accept $5,279,592 in Safe Streets and Roads for All (SS4A) Implementation Grant Funds from the Federal Highway Administration and Approve a local match of $1,319,898 in Traffic Safety Funds for the Revitalizing Roady Safety Project (Wards 2,4,5,6,7) Recommendation: It is recommended that the Mayor and City Council of the City of San Bernardino,…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Engineering services for the City’s SS4A safety project, initially preliminary engineering and NEPA support, with optional final design, right-of-way and utility coordination, bidding, construction engineering and inspection, and project closeout.
Request for Letters of Interest for professional engineering, design, and construction engineering and inspection (CEI) services for three temporary roadway safety demonstration projects.
The selected consultant will provide professional planning, engineering, and community engagement services to develop a Comprehensive Safety Action Plan (CSAP) and implement demonstration projects under the FHWA Safe Streets and Roads for All (SS4A) Grant Program. The scope encompasses data collection and analysis to establish High-Injury and High-Risk Networks, equity-centered bilingual community outreach, preliminary and final design of quick-build temporary roadway safety treatments, MUTCD engineering studies, environmental review assistance under NEPA and Section 106, construction administration and inspection, baseline performance monitoring, and multi-phase reporting consistent with FHWA's Safe Systems Approach.
Professional engineering firms are sought to provide roadway safety planning, inventory, analysis, design, environmental coordination, bidding, and construction engineering services for a coordinated improvement program. The work aims to improve nighttime visibility, traffic-control-device condition and consistency, and driver speed awareness. It also targets improved safety for people walking and bicycling, particularly near schools.
Key Contacts on this RFP
Decision makers connected to this RFP from City of San Bernardino.