CityGA
Posted
Sep 9, 2026
Oct 8, 2026
2023 PHMSA Grant - Buford Highway Natural Gas Main Replacement
Work includes approx. 9 EA of 6" steel gas line valve; 4 EA of 6" connect to existing HP steel gas main w/ L TPF; 1 EA of 1" cut and cap steel gas main; 95 CY of flowable fill; 100 SF remove and replace sidewalk; 10 CY of rock excavation.
