Metrolinx seeks qualified vendors to supply and deliver aluminum rims as required for its heavy-duty coaches operating in suburban and highway service. The contract is divided into two packages of specified Alcoa wheels. All parts must be new and original, and substitutions are not permitted.
Metrolinx is accepting submissions for preventative maintenance, remedial and emergency repairs for High-Speed Roll-Up Doors. The posting identifies this as a formal public tender, PT-2026-LCLO-326, located in Southern Ontario. Electronic bid submissions are accepted through MetrolinxMERX EBS until the stated closing date.
Metrolinx seeks to establish a pool of qualified providers offering professional rail and systems safety consulting, advisory, and assurance services. The services support rail regulatory oversight, including assessment and inspection activities across the Metrolinx network. The vendor-of-record arrangement will have an initial two-year term with three optional one-year extensions at Metrolinx’s sole discretion.
Thorncliffe Park Construction Liaison Committee Meeting Summary
Date: Aug 27, 2026Type: Meeting mention
The meeting focused on providing construction updates for three Ontario Line contracts. Discussions covered the progress on the elevated guideway and stations by Trillium Guideway Partners, including pile drilling and utility relocation plans. Leaside Valley Builders provided updates on the West Don Crossing, Don Valley Crossing, and Beth Nealson Underpass. Connect6ix detailed the construction of the traction power substation for the Operations, Maintenance and Storage Facility.
Metrolinx Board Of Directors Board Of Directors Meeting
Date: Sep 10, 2026Type: Meeting mention
The board reviewed various operational and administrative updates, including responses to public correspondence on service quality, accessibility, and transit noise. Key discussions focused on rail safety initiatives, the procurement of new transit vehicles, and the organization's adherence to regional procurement guidelines. The CEO provided reports on ridership performance during major events, the status of fair evasion enforcement, and temporary service adjustments. Additionally, the meeting addressed the findings of a derailment investigation and reviewed safety audits of critical station infrastructure.
Exhibition Community Liaison Committee Meeting Minutes
The meeting included project progress updates for the Ontario Line at Exhibition Station and Ordnance Park, highlighting ongoing structural steel work. Key discussion items centered on community impact mitigation, specifically regarding truck traffic routes, dust management, and street sweeping schedules. Participants addressed resident concerns about overnight noise generated by hauling operations and discussed the upcoming installation of a muck pit roof as a noise reduction measure. Further dialogue addressed issues involving bird access at local properties and the potential relocation of truck staging to Exhibition Place to minimize noise and idling impacts on local streets.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Metrolinx meetings, strategic plans, and budget discussions before the public bid appears.