Special DistrictGA
Jun 26, 2026
Closes
Aug 11, 2026
Amerson Water Treatment Plant Generator Fueling System Replacement RFP
The Project consists of replacing the existing underground fuel oil system with a new above-ground system.
Description: To furnish and install a new diesel standby generator at the existing water plant to provide backup power for critical water plant facilities during utility power outages.
County · TX, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Special DistrictGA
Jun 26, 2026
Closes
Aug 11, 2026
The Project consists of replacing the existing underground fuel oil system with a new above-ground system.
Special DistrictGA
Jun 26, 2026
Closes
Aug 11, 2026
The Project consists of replacing the existing underground fuel oil system with a new above-ground system.
CityFL
Jul 23, 2026
Closes
Aug 12, 2026
The City of Miramar is soliciting quotes from qualified contractors for the West Water Treatment Plant Permeable Parking Spaces Project. The work involves constructing six permeable parking spaces and furnishing all required materials, equipment, permits, and labor, with grading, paving, and resurfacing potentially required. This is an open construction request for quotation, not a grant program, with submissions due August 12, 2026.
CityNY
Jun 4, 2026
Closes
Aug 25, 2026
Installation of a 162 ID AWWA D110 Type III prestressed concrete tank, process piping and connection to distribution and other site improvements.
Procurement and program contacts connected to Waller County.