Phase 3 Gannon Golf Course Improvement Project
Bunker renovations, tee expansion and improvement and the repair and addition of bituminous concrete cart paths at the golf course.
Description: Bid primarily consists of removing and replacing the retaining walls between 2nd Avenue and first tee box of the Pottawatomie Golf Course. The bid will also consist of improving the cart paths around the first tee box.
SpecialDistrict · IL, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMA
Posted
-
Oct 8, 2026
Bunker renovations, tee expansion and improvement and the repair and addition of bituminous concrete cart paths at the golf course.
CityIA
Posted
Sep 18, 2026
Oct 9, 2026
The City of Davenport is soliciting bids for the Duck Creek Golf Course Maintenance Building Concrete Repairs Project at 4100 E Kimberly Road, Davenport, Iowa. Work includes the full completion of concrete floor repairs, including removal, preparation, reinforcement, and pouring of new concrete as specified. An optional pre-bid meeting is scheduled for September 29, 2026, at 8:00 AM at the maintenance facility, and bids are due October 9, 2026, at 9:00 AM CT.
CityWA
Posted
Sep 28, 2026
Oct 29, 2026
The scope of work includes the design, installation, testing, and commissioning of a new fully automated irrigation system serving all greens, tees, fairways, roughs, and landscape areas. The project will incorporate modern central irrigation controls, high-efficiency sprinkler heads, new main line and lateral piping, isolation valves, quick couplers, weather-based scheduling, and flow management technologies to optimize water usage. The complete project will provide reliable, energy-efficiency, and water-conserving irrigation system that supports healthy turf conditions, reduces maintenance cost, and preserves the character of the historic golf course while meeting current environmental standards. Also, the study of use of water retainage lagoons and wells will be part of the project scope the golf course irrigation system project design will comprise of three parts: mechanical, electrical and plumbing. The mechanical part will require- pumps, valves, control lines, sprinkler heads, fertigation injectors. The electrical part will comprise of control panels/central controller, relays and solenoid valves, sensors wiring and conduct. The plumbing will comprise of all piping, main supply lines.
OtherNJ
Posted
Sep 7, 2026
Oct 5, 2026
Replacement of a stone retaining wall approximately 150 linear feet across and up to 7 ft in height. Some small trees, saplings will need to be removed as well as shrubs along the toppart of the current retaining wall. An aluminum fence will line the top edge of the wall according to town safety codes.