University Of Massachusetts Medical School
Higher EducationMA
Aug 19, 2026
Closes
Sep 11, 2026
1st Floor Locker Room Expansion RFP
Work include renovation of approx 5,600 SF of existing locker rooms in two phases of work.
Description: Project consists of interior architectural renovations to the existing police department's women's locker room. .
City · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
University Of Massachusetts Medical School
Higher EducationMA
Aug 19, 2026
Closes
Sep 11, 2026
Work include renovation of approx 5,600 SF of existing locker rooms in two phases of work.
Essexville-Hampton Public Schools
School DistrictMI
-
Closes
Aug 31, 2026
Essexville-Hampton Public Schools seeks a qualified, licensed contractor to design, engineer, fabricate or procure, and install approximately 200 additional bleacher seats at Garber High School’s football field. A mandatory pre-bid meeting is listed for August 24, 2026, with questions due August 27, 2026 at 1:00 PM and sealed bids due August 31, 2026 at 1:00 PM. Required submissions include qualifications, references, project approach, schedule, lump-sum pricing, licenses, insurance, safety and subcontractor disclosures, with evaluation based on cost/value, experience, schedule, references, safety, and completeness.
Aug 27, 2026
Closes
Sep 7, 2026
The contractor shall provide all labor, materials, equipment, supervision and transportation necessary to perform the fence installation.
Washington State Department of Transportation
State AgencyWA
Aug 19, 2026
Closes
Sep 9, 2026
Washington State Ferries, part of the Washington State Department of Transportation, is seeking quotes for one portable, freestanding lithium-ion battery storage building/locker to be fabricated and delivered to the Eagle Harbor Maintenance Facility on Bainbridge Island. The unit must meet specified dimensional, ventilation, climate-control, electrical, fire-detection, safety, and regulatory requirements, while installation and site work are excluded. Vendor questions are due September 2, 2026, and quotations close on September 9, 2026.
Decision makers connected to this RFP from City of Coronado.