Description: Consists of furnishing all labor, materials and equipment to remove the existing 125 kW natural gas emergency generator and to furnish and install a new 250 kW natural gas standby generator set, automatic transfer switch, temporary standby power, and all associated electrical, natural gas and site work as required to complete the project. Proposals will be received on a Base Bid and on Generator Manufacturer Alternates as described in the Proposal.
City · IL, US
Decision makers connected to this RFP from City of Burbank.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIL
Posted
-
Nov 12, 2026
The City of Rockford, Illinois is soliciting bids for the replacement of emergency generators at Fire Station 8 and the Newburg Road Transmitter Site.
CityOK
Posted
Oct 21, 2026
Nov 18, 2026
Provide emergency generator cherry creek pump station.
CityTX
Posted
Oct 22, 2026
Nov 19, 2026
The project generally consists of replacing the existing power generator system. Based on the engineer-provided estimate and drawings, work may include electrical demolition; furnishing and installing a new natural-gas generator and automatic transfer switch (ATS); furnishing and installing a load bank; new electrical feeder/conductors and associated connections; 143 LF saw cutting, patching, painting, and sealing; concrete pad work; testing, commissioning, and site cleanup. The complete scope, equipment ratings, installation requirements, and all inclusions/exclusions shall be as stated in the engineer’s final technical specifications and drawings attached to this RFB
CountyNV
Posted
Oct 26, 2026
Dec 3, 2026
Work consists of the removal, replacement, and installation of an existing 40 kw propane gas generator and automatic transfer switch, to be replaced with a new 80 kw diesel fuel generator equipped with a minimum 24-hour base fuel tank, load bank, and two (2) 200a automatic transfer switches. Project also includes the removal and replacement of the existing pcc500 controller with a new pcc550 controller, as well as the furnishing and installation of a new docking station for emergency generator connection. Work includes the demolition and removal of the existing concrete generator pad and construction of two new concrete pads to support the upgraded equipment. Additionally, the project involves removal of the existing propane gas piping serving the generator and rerouting of the sanitary sewer line to accommodate the new installation.