Description: The Plymouth County Correctional Facility seeks sealed electronic bids for expansion of its central control room at 24 Long Pond Road, Plymouth, Massachusetts. The work includes partial demolition, bullet-resistant CMU walls and windows, millwork and workstations, HVAC work, guard-desk reconstruction, bullet-resistant doors and windows, and related toilet, fire-suppression, communications, electrical, lighting, and painting work. The estimated construction cost is $1,525,760; filed sub-bids are due October 7, 2026, and general bids are due October 14, 2026, through Projectdog.
PoliceDepartment · MA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from Plymouth County Sheriff's Department.
Adjacent opportunities open for bidding right now.
Plymouth County Sheriff's Department
Police DepartmentMA
Posted
Sep 22, 2026
Oct 14, 2026
The Plymouth County Correctional Facility seeks sealed electronic bids for expansion of its central control room at 24 Long Pond Road, Plymouth, Massachusetts. The work includes partial demolition, bullet-resistant CMU walls and windows, millwork and workstations, HVAC work, guard-desk reconstruction, bullet-resistant doors and windows, and related toilet, fire-suppression, communications, electrical, lighting, and painting work. The estimated construction cost is $1,525,760; filed sub-bids are due October 7, 2026, and general bids are due October 14, 2026, through Projectdog.
CityFL
Posted
Sep 29, 2026
Oct 29, 2026
The principal features of the Work to be performed under this Contract shall include but not limited to the following: 1. Relocation of the Biosolids Control Room from the ground-floor electrical room to convert the upstairs locker-room to a new Control Room including the following: a. Relocate newly built-in existing lab furniture from the electrical room currently also used as a control room to the new control room, and finish areas where furniture will be removed in the electrical room. b. Demolish the shower, remove lockers and install a kitchenette with features shown on the drawings in the new control room c. Replace existing water heater and wall air conditioning unit as shown on the drawings. d. Install plumbing, electrical outlets and internet cabling as shown on the drawings. e. Perform structural work to the roof and existing observation window as shown on the drawings.
CityVA
Posted
Sep 1, 2026
Oct 6, 2026
Project consists of renovation of existing structure to expand the men's locker room at the city's public utilities office. Work includes partial demolition of a concrete masonry unity (cmu) wall, construction of new cmu walls, plumbing to include supply and drain lines to new toilets, urinals and sinks, modifications to existing hvac ducts and addition of new electrical receptacles and lights.
Special DistrictFL
Posted
-
Oct 8, 2026
Request for qualifications from qualified construction manager at risk (cmar) firms with the experience necessary to complete expansion and process control improvements projects.