Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement of the sixteen final settling tank (FST) sludge collection system mechanisms, replacement of the aeration diffuser system within the four aeration tanks (AT), replacement of the four aeration blowers, ancillary process air system improvements, rehabilitation of the FST and AT interior structures, and improvements to related FST systems, such as Return Activated Sludge Pumps, scum pumps, FST Gallery sump pumps, spray water pumps, and polymer feed systems. The scope also includes rehabilitation, replacement, and improvements to the associated architectural features, and electrical, control, and HVAC systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
WWTP comprehensive rehabilitation construction project.
Posted Date
Nov 6, 2025
Due Date
Feb 19, 2026
Release: Nov 6, 2025
Close: Feb 19, 2026
WWTP comprehensive rehabilitation construction project.
AvailableSkanska USA Civil is soliciting subcontractor and vendor proposals for the Main Substation Replacement at the Owls Head Wastewater Resource Recovery Facility in Brooklyn, New York. The work includes upgrading the existing Main Substation, installing new power infrastructure such as transformers and switchgear, related site demolition, restoration, and associated building systems. Responses are due January 29, 2026; documents and full instructions are available via the official NYSCR posting.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Skanska USA Civil is soliciting subcontractor and vendor proposals for the Main Substation Replacement at the Owls Head Wastewater Resource Recovery Facility in Brooklyn, New York. The work includes upgrading the existing Main Substation, installing new power infrastructure such as transformers and switchgear, related site demolition, restoration, and associated building systems. Responses are due January 29, 2026; documents and full instructions are available via the official NYSCR posting.
Provide wwtp chlorine storage building rehabilitation.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
Provide wwtp chlorine storage building rehabilitation.
AvailableRehabilitation of the existing Wastewater Treatment Facilities including but not limited to headworks improvements (replacement of mechanical bar screen, wash press, and manual bar screen and installation of new slide gates), removal and replacement of HDPE liner for Aeration Basins 1 and 2, installation of floating aerators in Aeration Basin 2 and transfer of existing floating aerators from Aeration Basin 1 to Aeration Basin 2, replacement of 1 of 2 existing RAS pumps, removal of the clarifier scum pump station and installation of new scum drain lines, removal and replacement of aeration basin underdrain pumps, removal and replacement of various sluice gates throughout WWTP, all required electrical work, and SCADA system improvements.
Posted Date
Dec 23, 2025
Due Date
Feb 12, 2026
Release: Dec 23, 2025
Close: Feb 12, 2026
Rehabilitation of the existing Wastewater Treatment Facilities including but not limited to headworks improvements (replacement of mechanical bar screen, wash press, and manual bar screen and installation of new slide gates), removal and replacement of HDPE liner for Aeration Basins 1 and 2, installation of floating aerators in Aeration Basin 2 and transfer of existing floating aerators from Aeration Basin 1 to Aeration Basin 2, replacement of 1 of 2 existing RAS pumps, removal of the clarifier scum pump station and installation of new scum drain lines, removal and replacement of aeration basin underdrain pumps, removal and replacement of various sluice gates throughout WWTP, all required electrical work, and SCADA system improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis