FederalCA
Posted
Jul 22, 2026
Sep 17, 2026
Bradbury Dam Outlet Valve Replacement
To replace the existing 30" valves to enhance the operation and efficiency of water releases within the outlet works. Electrical inspection, design, and installation: Inspect the power system. Complete electrical design based on provided baseline and inspection results. Provide design documentation signed by a U.S. registered Electrical Engineer. Perform demolition and installation of electrical equipment. Electrical equipment to include panels, fuses, conduit, and conductors. Remove two (2) existing fixed-cone valves and the following peripheral equipment: Valve supports including anchors. Pipe spool piece. Valve actuators. Conductors, cables, and conduit associated with the valve actuators.