Summary
To replace the existing 30" valves to enhance the operation and efficiency of water releases within the outlet works. Electrical inspection, design, and installation: Inspect the power system. Complete electrical design based on provided baseline and inspection results. Provide design documentation signed by a U.S. registered Electrical Engineer. Perform demolition and installation of electrical equipment. Electrical equipment to include panels, fuses, conduit, and conductors. Remove two (2) existing fixed-cone valves and the following peripheral equipment: Valve supports including anchors. Pipe spool piece. Valve actuators. Conductors, cables, and conduit associated with the valve actuators.