State AgencySD
Jun 23, 2026
Closes
Sep 10, 2026
Dam Maintenance & Pipe Spillway Repairs - Isabel Dam
Dam maintenance & pipe spillway repairs.
Description: Irvine Ranch Water District is soliciting electronic lump-sum bids from prequalified bidders for Invitation 12101, covering spray-in-place pipe lining of existing 30-inch and 24-inch outlet pipe, replacement of three butterfly valves and actuators, valve-stem and appurtenance improvements, new air-vent piping, and removal of an existing outlet structure. The estimated bid value is $4,424,000, with a mandatory onsite pre-bid meeting and following site visit on August 27, 2026, and bids due September 17, 2026 at 2:00 PM PDT. The opportunity is a construction procurement rather than a grant, and prequalification for the bidders list is closed.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
State AgencySD
Jun 23, 2026
Closes
Sep 10, 2026
Dam maintenance & pipe spillway repairs.
Pennsylvania Department of General Services
State AgencyPA
Jul 24, 2026
Closes
Sep 8, 2026
The Pennsylvania Department of General Services (DGS), on behalf of the Pennsylvania Fish and Boat Commission, is issuing a Request for Proposals (RFP) for the Fords Lake Dam Dam Rehabilitation Project located at 1455 Fords Pond Rd, Clarks Summit, PA 18411 in Lackawanna County. The project involves general construction work to repair and rehabilitate the 17-ft high by 225-ft long combination earthen dam at Fords Pond, including sequencing construction on the roller-compacted earthen dam and existing spillways, controlling water from the existing dam structure during construction, and reinforcing concrete and dam joints on the existing spillway, with an estimated cost range of $2,000,000 to $3,000,000 and 270 calendar days duration. Proposals must be received by 2:00 PM on September 8, 2026, with a pre-proposal conference scheduled for August 7, 2026 at the Abington Community Library; Small Diverse Business (18%) and Veteran Business Enterprise (3%) participation goals apply.
Pennsylvania Department of General Services
State AgencyPA
Jul 24, 2026
Closes
Sep 8, 2026
The Pennsylvania Department of General Services (DGS), on behalf of the Pennsylvania Fish and Boat Commission, is issuing a Request for Proposals (RFP) for the Fords Lake Dam Dam Rehabilitation Project located at 1455 Fords Pond Rd, Clarks Summit, PA 18411 in Lackawanna County. The project involves general construction work to repair and rehabilitate the 17-ft high by 225-ft long combination earthen dam at Fords Pond, including sequencing construction on the roller-compacted earthen dam and existing spillways, controlling water from the existing dam structure during construction, and reinforcing concrete and dam joints on the existing spillway, with an estimated cost range of $2,000,000 to $3,000,000 and 270 calendar days duration. Proposals must be received by 2:00 PM on September 8, 2026, with a pre-proposal conference scheduled for August 7, 2026 at the Abington Community Library; Small Diverse Business (18%) and Veteran Business Enterprise (3%) participation goals apply.
Jun 3, 2026
Closes
Aug 31, 2026
Work shall include construction of a reinforced concrete auxiliary spillway with two, 8 feet by 16 feet, precast concrete culverts through the dam crest to serve as the spillway inlet with a reinforced concrete stepped chute along the downstream slope that discharges into a reinforced concrete stilling basin at the toe of the dam. A reinforced concrete floodwall with concrete cutoff shall be constructed along the upstream crest of the dam along KY-555 with rockfill placed along the upstream slope of the dam. A rockfill stability berm shall be constructed along the downstream slope. Work further includes a new low-level drawdown valve in the dry well of the riser structure, replacement of the existing low level drawdown valve, and remediation of concrete cracking and seepage in the existing principal spillway culvert. In addition, the City of Springfield’s raw water intake will be abandoned and new raw water intake lines installed within the principal spillway culvert. A Contractor designed Water Diversion Plan is required. The BASE BID Work will also consist of site preparation, erosion and sedimentation control, slope construction and protection, construction access, selective demolition, earthwork, temporary shoring, traffic control and maintenance, storm drainage, and site grading and restoration work. Demolition Work shall include demolition of existing storm sewer infrastructure, raw water lines, concrete ditches, KY 555 within the footprint of the new auxiliary spillway, existing valves and operators at the intake structure, partial demolition of the principal spillway culvert and wingwalls, and abandonment of existing embankment piezometers. The CONTRACTOR’s Work shall also include site safety, water control, site security, traffic control, and site cleanup.
Decision makers connected to this RFP from Irvine Ranch Water District.