CityIL
Posted
Sep 9, 2026
Sep 25, 2026
Replacement of the Boiler System (Request for Proposals)
Replacement of the boiler system.
Description: Work includes boiler replacement.
County · OH, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityIL
Posted
Sep 9, 2026
Sep 25, 2026
Replacement of the boiler system.
CountyOH
Posted
Aug 25, 2026
Sep 21, 2026
Seeking proposals from qualified vendors to provide boiler services.
White Plains Housing Authority
Special DistrictNY
Posted
Aug 23, 2026
Sep 24, 2026
Provide comprehensive boiler inspection, preventive maintenance, repair, and emergency response services for the boiler systems.
Southeast Wisconsin Professional Baseball Park District
Special DistrictWI
Posted
Aug 28, 2026
Sep 24, 2026
Coordinate and install rack mount equipment in mdf/idf room determined by owner. Contractor is required to correspond with the project electrical contractor to confirm system power, conduit, and cabling work associated with this project. Provide and install any required cabling, including analog and fiber optic cable as required. Provide and install any specified control panels and input plates in dedicated locations as shown in the design documents. Contractor is responsible for assembly, secondary modifications and mounting of specified components onto existing structures within the facility. Provide and install all equipment listed in the bid form document. Include all equipment not specifically listed but required to provide a completely functional system as part of this rfp. Coordinate with the owner regarding the programming expected for functionality within the iptv system throughout the facility. Provide dsp programming for and specified graphical user interfaces(s) (gui) and system control. Deliver sample dsp guis for review by the owner at least six weeks prior to system completion. Owner will review and sign off on functionality or provide requests for revisions. Revisions to programming is the responsibility of the contractor at no additional cost to the owner through three programming revisions.
Decision makers connected to this RFP from Mahoning County.