CityOK
Posted
-
Jan 8, 2027
Non-Arterial Street Rehabilitation & Waterline Replacement for Maintenance Zone 1070 RFP
Non-arterial street rehabilitation & waterline replacement.
Description: This solicitation seeks roadway construction and rehabilitation work for Maintenance Zone 4022. The stated scope includes excavation, pavement milling and placement, concrete work, drainage structures, and site restoration. The City’s listing identifies it as a construction bid and provides a bid form, specification book, and drawings, so it is a procurement rather than a grant program.
City · OK, US
Adjacent opportunities open for bidding right now.
CityOK
Posted
-
Jan 8, 2027
Non-arterial street rehabilitation & waterline replacement.
CityWA
Posted
Oct 28, 2026
Dec 2, 2026
This project involves upgrading the existing exhaust fan system and installing a new makeup air unit to improve the removal of noxious gases generated in the welding shop.
CityKS
Posted
Nov 4, 2026
Nov 24, 2026
Work includes asphalt improvements.
CityTX
Posted
Nov 5, 2026
Nov 24, 2026
The full-depth reconstruction of approximately 1,600 linear feet of existing roadway, beginning at its intersection with Judge Ely Boulevard and extending westward along Hailey Street. Improvements include the removal and disposal of existing hot mix asphalt pavement, roadway base material, and concrete curb and gutter, followed by preparation and lime stabilization of the underlying subgrade. The proposed roadway section will consist of 7 inches of flexible base material, new concrete curb and gutter, and hot mix asphalt pavement in accordance with the construction plans and specifications. Construction activities shall include necessary grading, compaction, and adjustments to existing improvements to accommodate the proposed roadway elevations and drainage patterns. The Contractor shall coordinate construction sequencing and maintain reasonable access to adjacent properties throughout the project, minimizing disruptions to existing property owners to the extent practical. The project will also require coordination with AEP Texas for overhead electrical utility pole adjustments or relocations, with such utility work to be performed by AEP Texas. The Contractor shall coordinate its construction schedule with the required utility work to minimize conflicts and facilitate timely completion of the roadway improvements.
Decision makers connected to this RFP from City of Tulsa.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
447 days before RFP
The Public Works Committee recorded funded and advancing Improve Our Tulsa street-program design, construction, and ongoing non-arterial maintenance work over the following several years.
They have three drawings and three listing of projects. And each of those is one is for the IoT one program. The other is next for the IoT 2019 otherwise known as IoT2. And the third one is IoT3. And each map has a code number. And if you look on the following sheets, there's a correlation of the code number to the project name and project status. >> And…
Council Public Works Committee Public Works Committee Meeting
Board meeting · Aug 27, 2025
Proposed budget
139 days before RFP
The proposed FY27 budget lists $9.045 million for CW Non-Arterial Street Rehab.
FY 27 FINANCIAL Sum of P.FINSuSum of A.FINP BUDGET PLAN ASSET MANAGEMENT Citywide Facilities Maintenance 4000000 4000000 5,000$ 4,000$ ASSET MANAGEMENT TOTAL 4000000 4000000 5,000 4,000 FIRE Fire Apparatus and Equipment 8277000 8277000 7,461 8,277 FIRE TOTAL 8277000 8277000 7,461 8,277 PARKS AND RECREATION ACC - Building Improvements 2950000 2950000 15,850…
City of Tulsa FY2026-27 Proposed Budget
Proposed budget · Jul 1, 2026
Board meeting
27 days before RFP
The committee considered a proposed FY2026-2027 supplemental appropriation of $26,320,000 for streets, sidewalks, bridges, and maintenance-zone repairs.
Um all right. Item number 11. ordinance amending the fiscal year 2026-2027 budget to make supplemental appropriations of 26,320,000 dollars recognized from unappropriated fund balance within the 2020 gold bond issue seven subfund. For streets, sidewalks, bridges, and maintenance, zone repairs, and cost of issuance projects. >> And so this is IOT 2. This is…
Council Urban & Economic Development Committee Committee Meeting
Board meeting · Oct 21, 2026
Board meeting
27 days before RFP
The committee considered a proposed $39,340,000 FY2026-2027 supplemental appropriation from the 2024 GO issue for street repairs and bridge rehabilitation.
Item number 12, ordinance amending the fiscal year 2026-2027 budget to make supplemental appropriations of 39,340,000 recognized from unappropriated fund balance within the 2024 GO issues six subfund for street repairs, bridge rehabilitation, etc., etc. >> Um so, this is another appropriation of GO bond funds. Um this is for IOT 3.
Council Urban & Economic Development Committee Committee Meeting
Board meeting · Oct 21, 2026
RFP published
Proposals due (26 days left)