Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Upper Colorado Regional Office
Construct new pumping plant: sitework, including cement-bentonite cutoff wall. Steel manifold piping, including connection to existing ductile iron line pipe. Metal building system and foundations. Cast-in-place concrete building structures. Vertical turbine pumping units. Air chambers. Electrical system. SCADA system. Water quality monitoring equipment. Demolition of existing pumping plant.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Gulf Coast Water Authority
Provide shannon pumping plant project.
Posted Date
Sep 18, 2025
Due Date
Nov 19, 2025
Release: Sep 18, 2025
Gulf Coast Water Authority
Close: Nov 19, 2025
Provide shannon pumping plant project.
AvailableTown of North Wilkesboro
Construction of a new raw water pump station and intake. The new raw water pump station will include a total of five (5) vertical turbine pumps, associated electrical and control equipment, intake wet-well, run-of-river intake screens with air burst cleaning system, intake piping, emergency generators, and pump station building. The project will also include approx., 140' of 30" diameter raw water line and approx., 40' of 20" diameter raw water line.
Posted Date
Sep 12, 2025
Due Date
Nov 20, 2025
Release: Sep 12, 2025
Town of North Wilkesboro
Close: Nov 20, 2025
Construction of a new raw water pump station and intake. The new raw water pump station will include a total of five (5) vertical turbine pumps, associated electrical and control equipment, intake wet-well, run-of-river intake screens with air burst cleaning system, intake piping, emergency generators, and pump station building. The project will also include approx., 140' of 30" diameter raw water line and approx., 40' of 20" diameter raw water line.
AvailableOrillia
The City of Orillia is requesting proposals to perform a condition assessment of its Water Filtration Plant, Wastewater Treatment Centre, and pumping stations. Proposals must be submitted online via Bids & Tenders by the stated closing date and time.
Posted Date
Nov 14, 2025
Due Date
Dec 8, 2025
Release: Nov 14, 2025
Orillia
Close: Dec 8, 2025
The City of Orillia is requesting proposals to perform a condition assessment of its Water Filtration Plant, Wastewater Treatment Centre, and pumping stations. Proposals must be submitted online via Bids & Tenders by the stated closing date and time.
AvailableUpper Colorado Regional Office
The principal components of work for the Block 2-3 HDD include, but are not limited to, the following: HDD for 42" buried water transmission pipeline crossing; HDD for 36" buried water transmission pipeline crossings.
Posted Date
Oct 6, 2025
Due Date
Jan 28, 2026
Release: Oct 6, 2025
Upper Colorado Regional Office
Close: Jan 28, 2026
The principal components of work for the Block 2-3 HDD include, but are not limited to, the following: HDD for 42" buried water transmission pipeline crossing; HDD for 36" buried water transmission pipeline crossings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis