Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Upper Colorado Regional Office
The U.S. Bureau of Reclamation, Upper Colorado Basin Region issued a presolicitation for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline to construct buried water transmission pipelines and storage tanks. This full and open procurement has an estimated value between $100,000,000 and $150,000,000 and is expected to be a fixed-price contract. The project includes the construction of SCADA systems and associated works with a response deadline set for June 2026.
Posted Date
Mar 10, 2026
Due Date
Jun 24, 2026
Release: Mar 10, 2026
Upper Colorado Regional Office
Close: Jun 24, 2026
The U.S. Bureau of Reclamation, Upper Colorado Basin Region issued a presolicitation for the Navajo-Gallup Water Supply Project (NGWSP) Block 2-3 Pipeline to construct buried water transmission pipelines and storage tanks. This full and open procurement has an estimated value between $100,000,000 and $150,000,000 and is expected to be a fixed-price contract. The project includes the construction of SCADA systems and associated works with a response deadline set for June 2026.
AvailableUpper Colorado Regional Office
The Bureau of Reclamation (Upper Colorado Regional Office) issued a presolicitation for replacement of the SCADA Uninterruptible Power Supply (UPS) at Glen Canyon Dam, including demolition/removal of the existing UPS and installation of a new UPS with associated conduit, conductors, testing, commissioning, and training. The notice was posted 2026-03-09 and responses are due 2026-03-16 at 5:00 PM EDT; the estimated contract value range is $1,000,000–$5,000,000 and NAICS 238210 applies. The procurement is a presolicitation/contract opportunity (not a grant), solicitation number 140R4026R0006, issued by the Bureau of Reclamation.
Posted Date
Mar 9, 2026
Due Date
Mar 16, 2026
Release: Mar 9, 2026
Upper Colorado Regional Office
Close: Mar 16, 2026
The Bureau of Reclamation (Upper Colorado Regional Office) issued a presolicitation for replacement of the SCADA Uninterruptible Power Supply (UPS) at Glen Canyon Dam, including demolition/removal of the existing UPS and installation of a new UPS with associated conduit, conductors, testing, commissioning, and training. The notice was posted 2026-03-09 and responses are due 2026-03-16 at 5:00 PM EDT; the estimated contract value range is $1,000,000–$5,000,000 and NAICS 238210 applies. The procurement is a presolicitation/contract opportunity (not a grant), solicitation number 140R4026R0006, issued by the Bureau of Reclamation.
AvailableUpper Colorado Regional Office
Provide ECAO chiller compressor replacement. Supply and incidental installation of a new commercially available, water-cooled chiller to replace the existing 50-ton unit.
Posted Date
Mar 2, 2026
Due Date
Mar 13, 2026
Release: Mar 2, 2026
Upper Colorado Regional Office
Close: Mar 13, 2026
Provide ECAO chiller compressor replacement. Supply and incidental installation of a new commercially available, water-cooled chiller to replace the existing 50-ton unit.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Track vendor wins and renewal opportunities
Upper Colorado Regional Office
HAMMOND CANAL FLOW MONITORING
Effective Date
Dec 8, 2025
Expires
Effective: Dec 8, 2025
Upper Colorado Regional Office
Expires:
HAMMOND CANAL FLOW MONITORING
AvailableUpper Colorado Regional Office
NGWSP REACH 1 PIPELINE REPAIRS
Effective Date
Jun 24, 2025
Expires
Effective: Jun 24, 2025
Upper Colorado Regional Office
Expires:
NGWSP REACH 1 PIPELINE REPAIRS
AvailableUpper Colorado Regional Office
RG- EBHD UTILITY REHAB
Effective Date
Sep 20, 2024
Expires
Effective: Sep 20, 2024
Upper Colorado Regional Office
Expires:
RG- EBHD UTILITY REHAB
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Track Upper Colorado Regional Office's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database