NGWSP Cutter Lateral Reach 21 Booster Plant RFP
Posted
Sep 30, 2026
Oct 30, 2026
The principal components of work for the Cutter Lateral Reach 21 Booster Plant include, but are not limited to, the following: 1. Pre-engineered concrete booster pump station, concrete foundation pad, pipe encasement, yard pipe, fencing, electrical equipment, gravel surfacing, and pipe connections. 2. Installation of secondary regulation tank at Regulation Tank No. 3 site, foundation, electrical equipment, yard pipe, and pipe connections. 3. Erosion and scour restoration/prevention: a. Includes a retaining wall, swale, runoff channel, and site regrading. 4. Reinstallation of gravel surfacing at Regulation Tank No. 3 site. 5. Supervisory Control and Data Acquisition (SCADA) equipment and radio communications system.