CityTN
Posted
Sep 24, 2026
Oct 15, 2026
Whitwell City Park Tennis Court Renovations RFP
Project includes the following work: resurfacing existing tennis court surface and new basketball court.
Description: Work inlcudes new tennis court facility.
SchoolDistrict · MS, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityTN
Posted
Sep 24, 2026
Oct 15, 2026
Project includes the following work: resurfacing existing tennis court surface and new basketball court.
Merrillville Community School District
School DistrictIN
Posted
Oct 2, 2026
Oct 20, 2026
Work includes: general construction to include construction of a new locker room facility and renovations to the concessions and tennis facilities.
CityGA
Posted
Sep 2, 2026
Oct 9, 2026
The City of South Fulton is soliciting proposals under RFP 26-38 from qualified and experienced contractors to rehabilitate and reconstruct four existing tennis courts at the South Fulton Tennis Center. The solicitation includes proposal instructions, schedule, minimum qualifications, site-visit information, evaluation criteria, required attachments, bonding and insurance requirements, a cost form, and general terms and conditions. This is a formal construction-services procurement—not a grant program—with proposals due October 9, 2026, at 2:00 PM Eastern Time.
School DistrictGA
Posted
Sep 16, 2026
Oct 19, 2026
Seeking qualified contractors for turnkey construction of a 20' x 30' concession/restroom facility at the tennis courts. The building shall include a gable-style metal roof and decorative block/masonry designed to match existing structures. The facility shall include an approximately 13' x 9' storage/electrical room with exterior metal door and an approximately 17' x 10' concession area with exterior metal door, 8' roll-up service door, serving counter, sink, and hot water heater. The men's restroom shall have a separate exterior metal door and include an ADA-accessible stall with toilet, one urinal, and one sink. The women's restroom shall have a separate exterior metal door and include one ADA-accessible stall with toilet, two additional stalls with toilets, and one sink. The project shall include all site work, foundation/slab, flooring, interior and exterior painting/finishes, plumbing, electrical service, wiring, receptacles, interior/exterior lighting, fixtures, ventilation, doors and hardware, and all other materials and labor necessary for a complete facility. The project shall also include a complete lift station, including pumps, controls, alarm, electrical service, piping, excavation, and connection to the existing stubbed sanitary plumbing/sewer. All flooring shall be durable and appropriate for its intended use, with moisture- and slip-resistant flooring in concession and restroom areas. All work shall comply with applicable Georgia building, electrical, plumbing, fire/life-safety and accessibility codes and ADA requirements. The contractor shall be responsible for required permits and inspections. The proposal shall provide a lump-sum turnkey price inclusive of all labor, materials, equipment, permits, site work, utilities, finishes, testing, cleanup, and incidental items necessary for a complete operational facility. Any exclusions must be clearly identified.
Decision makers connected to this RFP from George County School District.