CityOK
Aug 13, 2026
Closes
Sep 9, 2026
Invitation for Bid (IFB) IFB 27-811 Supplies or Services Requested: 48" Material for Waterline Repairs
This Invitation for Bid (IFB) is for the procurement of 48" Materials for Waterline Repairs.
Description: Work generally consists of the removal and replacement of existing 10-inch and 12" water main valves and associated 2-inch bypass valves and piping connected to existing asbestos-cement (acp) water mains at three separate locations. Work includes excavation and trenching; removal and proper disposal of acp pipe segments; installation of new valves, fittings, couplers, and associated appurtenances; temporary water bypass systems; dewatering as necessary; pavement removal and restoration; fire protection permitting and inspections; testing and disinfection of water system components; and all related work necessary to complete the project in accordance with the contract documents. Construction activities shall be coordinated with ongoing terminal, vessel, rail, and military operations to minimize operational impacts.
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityOK
Aug 13, 2026
Closes
Sep 9, 2026
This Invitation for Bid (IFB) is for the procurement of 48" Materials for Waterline Repairs.
CityMS
Aug 11, 2026
Closes
Sep 10, 2026
The work shall consist of: construction of water line and appurtenances.
CityVT
Aug 5, 2026
Closes
Aug 25, 2026
The Village of Swanton is soliciting a Job Contract titled "Gallup Court Waterline" (RFQ Number: Contract #1). The project calls for installation of approximately 680 linear feet of new waterline to replace the existing waterline on Gallup Court in the Village of Swanton. The government posting lists a site visit for 8/11/2026 at 10:00:00 AM at 120 First Street, Swanton, VT, and identifies the procurement as a construction job contract rather than a grant program.
Rio Lucio Mutual Domestic Water Consumers Assoc.
Special DistrictNM
Aug 2, 2026
Closes
Sep 1, 2026
Project includes the following work: installation of approx 3,140 LF of 4" c900 PVC waterline including gate valves, fire hydrants, and appurtenances; approx 30 new water meter assemblies and other related meter replacement work.
Procurement and program contacts connected to San Diego Unified Port District.