Galvanized Waterline Replacement II
Work includes install 1,450-feet of two (2") inch sdr 21 (pvc). Combined total for both locations. See project material list for appurtenances; install applicable gate valves, blow off valves and fittings; replace 19 existing 3/4" services, piping and fittings (include new angle valve, yoke bar and residential dual check per sl&w detail) see 'project material list' for appurtenances; install concrete monuments and donuts on all new gate and blow off valves. Installation shall be in accordance with site s proposed layout (see attachment section. And testing of new installations shall be per sl&w requirements. See attached file.