Special DistrictLA
Posted
Jun 18, 2025
Nov 12, 2026
Water Production System Improvements, East Well #2 RFP
Project consists of water production system improvements, east well #2. See outside link.
Description: Project shall consist of construction of well improvements at the water plant (mb wp) #2 as shown on the drawings and included herein. The project improvements include but are not limited to a groundwater well; precast concrete electrical building; temporary disinfection feed system, including a fiberglass reinforced polymer (frp) chemical feed building and exterior chlorine storage cabinets mounted on a concrete pad; yard piping improvements; clearing and grubbing; grading and site work; sidewalk and paving; site perimeter fence and electrical gate; new electrical service, standby generator; and associated electrical and scada work. The work includes all labor, materials, off-site waste disposal, groundwater control, temporary provisions, testing, supervision, coordination, and subsidiary and incidental work necessary to provide complete and operational systems in accordance with the contract documents. See attached file.
City · TX, US
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
156 days before RFP
The City's TIRZ application proposed $6.5 million in financing for a new 2,600-gpm well at Plant #2, with design complete in November 2025, bidding planned for March 2026, and construction planned from May 2026 through November 2027.
TAX INCREMENT REINVESTMENT ZONE NO 2 REQUEST FOR TAX INCREMENT FUNDING MUSTANG BAYOU SERVICE AREA WATER/WASTEWATER PROJECTS SUMMARY November 2025 Potable water is a mainstay of any community. A reliable, safe source of water is required for a community to establish and a lack of water has historically made communities and civilizations move or perish. Water…
Missouri City Development Authority Meeting Agenda
Meeting agenda · May 18, 2026
Proposed budget
20 days before RFP
The FY 2027 Proposed Budget lists CIP Project 80054, Mustang Bayou Service Area New Well, with $5,500,000 shown for the project.
047 80054 Mustang Bayou Service Area New Well 5,500,000 5,500,000
City of Missouri City FY2027 Proposed Budget
Proposed budget · Oct 1, 2026
RFP published
Proposals due (13 days left)
Decision makers connected to this RFP from City of Missouri City.
Adjacent opportunities open for bidding right now.
Special DistrictLA
Posted
Jun 18, 2025
Nov 12, 2026
Project consists of water production system improvements, east well #2. See outside link.
Special DistrictTX
Posted
Oct 20, 2026
Nov 12, 2026
Work includes excavation & offsite disposal of excess material not used in project, excluding over excavation, reinforced filter fabric barrier, lime-fly ash stabilized subgrade (4% lime & 8% fly ash), complete in place includes labor and materials (in-situ conditions to be confirmed during construction); Riprap Gradation No. 2 (Min 24") (Lining);CL C Concrete (Misc) (Seat Wall).
CityOH
Posted
-
Nov 17, 2026
This Invitation to Bid is for the rehabilitation and repair of two existing lime softening clarifiers at the Water Treatment Plant, including the replacement of mechanical drives, corroded steel, painting, and other related components.
Special DistrictTX
Posted
Sep 24, 2026
Oct 29, 2026
The project will include the construction of one (1) water well, disinfection modifications, plant piping, electrical modifications, site work, and all additional items.