Mustang Bayou Water Plant #2 Well Improvements RFP
Project shall consist of construction of well improvements at the water plant (mb wp) #2 as shown on the drawings and included herein. The project improvements include but are not limited to a groundwater well; precast concrete electrical building; temporary disinfection feed system, including a fiberglass reinforced polymer (frp) chemical feed building and exterior chlorine storage cabinets mounted on a concrete pad; yard piping improvements; clearing and grubbing; grading and site work; sidewalk and paving; site perimeter fence and electrical gate; new electrical service, standby generator; and associated electrical and scada work. The work includes all labor, materials, off-site waste disposal, groundwater control, temporary provisions, testing, supervision, coordination, and subsidiary and incidental work necessary to provide complete and operational systems in accordance with the contract documents. See attached file.