Buffalo Bayou Greenway Improvements RFP
Posted
Oct 20, 2026
Nov 12, 2026
Work includes excavation & offsite disposal of excess material not used in project, excluding over excavation, reinforced filter fabric barrier, lime-fly ash stabilized subgrade (4% lime & 8% fly ash), complete in place includes labor and materials (in-situ conditions to be confirmed during construction); Riprap Gradation No. 2 (Min 24") (Lining);CL C Concrete (Misc) (Seat Wall).