Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Houston Parks Board
Work inlcudes temp construction fencing; tree protection fencing; removal of drinking fountains (2); removal and relocation of drinking fountain; removal of existing tree stumps; removal of park signs, posts and wood bollards; remove, salvage, and reinstall 2 park signs; removal of playground equipment and surfacing; demolition of existing pavement and re-grading; remove, salvage, and reinstall existing bleacher including replacement of wood seats; remove and replace chain link fabric at backstop; demolition of site furnishings including benches, trash cans, and picnic tables. See attached file.
Posted Date
Jul 10, 2026
Due Date
Aug 11, 2026
Release: Jul 10, 2026
Houston Parks Board
Close: Aug 11, 2026
Work inlcudes temp construction fencing; tree protection fencing; removal of drinking fountains (2); removal and relocation of drinking fountain; removal of existing tree stumps; removal of park signs, posts and wood bollards; remove, salvage, and reinstall 2 park signs; removal of playground equipment and surfacing; demolition of existing pavement and re-grading; remove, salvage, and reinstall existing bleacher including replacement of wood seats; remove and replace chain link fabric at backstop; demolition of site furnishings including benches, trash cans, and picnic tables. See attached file.
AvailableHouston Parks Board
This project includes concrete pedestrian trail, natural surface trail, lime stabilized base, 10' x 8' RCB, concrete structures, walls, tree planting, seed planting, sod.
Posted Date
-
Due Date
Dec 2, 2025
Houston Parks Board
Close: Dec 2, 2025
This project includes concrete pedestrian trail, natural surface trail, lime stabilized base, 10' x 8' RCB, concrete structures, walls, tree planting, seed planting, sod.
Houston Parks Board
The work includes but is not limited to: the installation of a 10' wide concrete trail, riprap removal, striping. Also includes 5,265 SY of concrete pedestrian trail, 2.30 AC of clearing and grubbing; 1,670 SY of turf establishment full sodding and 1 LS of traffic control. See attached files.
Posted Date
Feb 3, 2025
Due Date
Mar 6, 2025
Release: Feb 3, 2025
Houston Parks Board
Close: Mar 6, 2025
The work includes but is not limited to: the installation of a 10' wide concrete trail, riprap removal, striping. Also includes 5,265 SY of concrete pedestrian trail, 2.30 AC of clearing and grubbing; 1,670 SY of turf establishment full sodding and 1 LS of traffic control. See attached files.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge