CityNY
Posted
Sep 25, 2026
Oct 29, 2026
Production Well No. 2 Raw Water Transmission Main
Provide and install approx. 5,360 LF of 4-IN raw water transmission main, consisting of approx. 2,523 LF installed by horizontal directional drilling and 2,837 LF installed by open-cut construction, extending from the well site to the existing raw water transmission main near the intersection.
