Special DistrictMO
Posted
Nov 4, 2026
Dec 16, 2026
KCI Pump Station Improvements- Phase 1 (design-build) RFP
Design-build (DB) services including design, construction, startup, and commissioning for the pump station improvements.
Description: The project involves retrofitting three flood-control pump stations in Moorhead. Work includes replacing pumps and related incidentals and performing minor site work. The City of Moorhead identifies QuestCDN as its engineering-bid posting platform, but I could not locate this solicitation’s individual original posting.
City · MN, US
Decision makers connected to this RFP from City of Moorhead.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Special DistrictMO
Posted
Nov 4, 2026
Dec 16, 2026
Design-build (DB) services including design, construction, startup, and commissioning for the pump station improvements.
CityMO
Posted
Nov 5, 2026
Dec 16, 2026
The RFQP seeks design-build services to replace two submersible pumps and associated infrastructure. The work also includes salvaging and replacing a crane. It further includes upgrades to electrical service, equipment, and controls.
CityIL
Posted
Nov 15, 2026
Nov 30, 2026
Summit Pump Station Improvements
CityNC
Posted
-
Dec 2, 2026
Work consists of upgrading the riverdale pump station from 30 mgd to 45 mgd, including demolition and modifications to existing facilities; installation of new pumps, piping, odor control, generator, and electrical building; electrical, instrumentation, and scada improvements; and associated utility and site work, temporary bypass pumping to maintain continuous wastewater service during construction, startup, testing, and commissioning.