Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
Government ID for mapping buyers across datasets.
Full-time equivalent employees.
Population size to gauge opportunity scale.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
City of Moorhead
Project generally consists of removing and replacing grout within the existing screw pump station troughs, surface preparation and coatings of screw pumps, fiberglass covers, grout and ancillary equipment at the wastewater treatment facility.
Posted Date
Jul 1, 2026
Due Date
Jul 22, 2026
Release: Jul 1, 2026
City of Moorhead
Close: Jul 22, 2026
Project generally consists of removing and replacing grout within the existing screw pump station troughs, surface preparation and coatings of screw pumps, fiberglass covers, grout and ancillary equipment at the wastewater treatment facility.
AvailableCity of Moorhead
The City of Moorhead, Minnesota, in partnership with the City of Fargo, North Dakota, is soliciting contractor bids for the construction of a Pedestrian Bridge and Shared-Use Path over the Red River connecting 40th Avenue South in Fargo to 50th Avenue South in Moorhead near the Bluestem Amphitheater. The project consists of an approximately 670-foot long, 12-foot-wide pedestrian bridge built above the 100-year flood elevation, together with a 10-foot wide shared-use path with 2-foot shoulders connecting to existing trail networks on both sides of the river. Houston Engineering is the project engineer for solicitation, with construction planned for 2027 and bids due on July 22, 2026.
Posted Date
Jul 1, 2026
Due Date
Jul 22, 2026
Release: Jul 1, 2026
City of Moorhead
Close: Jul 22, 2026
The City of Moorhead, Minnesota, in partnership with the City of Fargo, North Dakota, is soliciting contractor bids for the construction of a Pedestrian Bridge and Shared-Use Path over the Red River connecting 40th Avenue South in Fargo to 50th Avenue South in Moorhead near the Bluestem Amphitheater. The project consists of an approximately 670-foot long, 12-foot-wide pedestrian bridge built above the 100-year flood elevation, together with a 10-foot wide shared-use path with 2-foot shoulders connecting to existing trail networks on both sides of the river. Houston Engineering is the project engineer for solicitation, with construction planned for 2027 and bids due on July 22, 2026.
AvailableCity of Moorhead
Reconstruction of Center Ave including the removal and replacement of pavement, curb & gutter, sidewalk, and lighting. Minor utility work.
Posted Date
May 12, 2026
Due Date
Jun 2, 2026
Release: May 12, 2026
City of Moorhead
Close: Jun 2, 2026
Reconstruction of Center Ave including the removal and replacement of pavement, curb & gutter, sidewalk, and lighting. Minor utility work.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable here; the City avoids sole source awards. Redirect to public bid.
Coops: If they’re open to alternatives, mention CPV/OSP, Sourcewell, OMNIA. Buyer hasn’t historically used coops, but you can encourage them to explore these procurement programs as future options.
City of Moorhead (MN). No evidence of sole source awards; the City adheres to competitive bidding.
Board meetings and strategic plans from City of Moorhead
This Strategic Plan establishes the mission, vision, and values for the City of Moorhead. It is built upon seven key strategic initiatives: Identity, Governance & Teamwork, Infrastructure, Economy, Community Safety & Well-Being, Communication, and Partnerships. The plan documents collaboratively developed goals by the Council and staff, serving as a framework for future budgeting and guiding the development of the Operations Plan, with a commitment to inclusive governance and management.
The Moorhead Safe Routes To School Plan aims to enhance the safety, health, and accessibility of walking and biking to school for students within the Moorhead Public School District. It identifies existing challenges, provides recommendations for infrastructure improvements, and suggests programs, policies, and activities to encourage active transportation. The plan incorporates "The Six E's" framework: Education, Encouragement, Engineering, Enforcement, Evaluation, and Equity, to create safer and more inviting routes to school.
The US 10 / US 75 Corridor Study, led by the Fargo-Moorhead Council of Governments and its partners, was conducted to develop context-sensitive solutions and corridor visions for the US 10 and US 75 corridors in Moorhead, MN. The study's overarching goals include aligning roadways with land use, accommodating all users through 'complete streets' principles, stimulating growth, providing flexibility for transportation needs, and enhancing the 'Gateway' feel of the corridors. This document serves as a framework to guide future studies and MnDOT's planned reconstruction projects in 2025 and 2026, aiming to meet needs for over 30 years.
The Downtown Moorhead Master Plan aims to reimagine and build Downtown Moorhead based on community values of authenticity, vibrancy, equity and inclusion, resilience, and connectivity. It seeks to establish Downtown as a dynamic urban core that attracts investment, industry, jobs, and residents by enhancing academic, cultural, and public service opportunities. Key focus areas include placemaking, redevelopment of the Moorhead Center Mall, development at Woodlawn Pointe, and improvements to the 11th Street Underpass to foster a connected, sustainable, and inclusive community.
This annual development report for the City of Moorhead summarizes the progress made in 2025 towards its 'Onward Moorhead! Comprehensive Plan 2022-2027'. The plan's strategic direction is guided by five key ideas: Investing in Downtown, Connecting Neighborhoods, Fostering Sustainability, Creating Great Experiences in existing and new places, and Supporting and Celebrating Businesses. The report details developments across residential, commercial, industrial, and institutional sectors, outlines strategic priorities in economy, infrastructure, and sustainability, and provides a forecast for 2026.
Extracted from official board minutes, strategic plans, and video transcripts.
Track City of Moorhead's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge