Moab Cyn Pathway, Extension to Raptor St Prk RFP

Description: Work consists of 230 SY of remove asphalt pavement; 20,161 CY of roadway excavation; 100 CY of small ditch construction; 120 ft of surface ditch; 725 CY of compacted riprap; 400 ft of drainage pipe - 18", smooth, leak-resistant; 4,217 CY of untreated base course; 2,643 ton of HMA - bike/ped path; 58 CY of concrete flatwork, 6" thick - low flow crossing; 105 CY of granular backfill borrow; 245 CY of free draining granular backfill; 435 SY of drainage geotextile; 345 SY of stabilization geotextile; 4,920 SF of concrete coating; 70 SF of sign type a-1; 31 SF of sign type a-2; 44 gal of pavement marking paint.

Buyer
Released
Oct 10, 2026
Closes
Nov 10, 2026(17 days left)