Cleveland Hill Fire Department #6
Fire DepartmentNY
Posted
Sep 24, 2026
Oct 15, 2026
Concrete Replacement RFP
Work includes : replacement of the back parking lot approach from the street with a minimum of (8) eight inches, the concrete to the rear entrance of the building with a minimum of (4) four inches, and various blocks of the sidewalk.
