Progress Avenue Water Main Extension Project RFP
Provide qualified professional consultant engineering firms (engineer) with expertise in designing water main replacement projects.
Description: Work includes water main extension.
SpecialDistrict · FL, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
521 days before RFP
FGUA approved a $1,294,118 FDEP grant for the multiphase 28th Street SW water-main extension, with design preparation to follow.
OP 1 Approval of Standard Grant Agreement L0039 between the State of Florida Department of Environmental Protection and the FGUA related to the 28th Street SW Water Main Extension, Project LEP 48, located in the Lehigh Acres Utility System, Lee County. Mr. John Carlson provided an update on this item. The item is regarding a Standard Grant Agreement between…
Florida Governmental Utility Authority Board Of Directors Meeting Minutes
Board meeting · May 15, 2025
LEHIGH LEP48 L0039 GRANT - 100% WATER MAIN EXTENSIONS 28TH STREET SW 1,294,118.00$
Florida Governmental Utility Authority Strategic Planning Session 2026-2031
Strategic plan · Mar 19, 2026
Board meeting
486 days before RFP
FGUA approved engineering and capital project administration work authorizations for the 28th Street SW Water Main Extension.
CA 1 Approval of Work Authorization No. JE 25-02 with Johnson Engineering Inc. for Consulting Engineering Services related to the 28th Street SW Water Main Extension, FGUA Project No. LEP 48, located in the Lehigh Acres Utility System, Lee County in the lump sum amount of $158,565.00. CA 1a Approval of Work Authorization No. GSG 25-20 with Government…
Board meeting
213 days before RFP
FGUA recorded that the 28th Street Water Main Extension covered approximately 4,850 LF of 10-inch main and 4,200 LF of 8-inch main, with design documents complete, permitting underway, and bidding expected to be scheduled that quarter.
28th Street Water Main Extension This project involves the design and construc�on of approximately 4,850 LF of 10" water main along 28th Street SW and approximately 4,200 of 8" water main along the surrounding streets. The purpose of this project is to provide a potable water transmission main. This project is grant funded. Johnson Engineering has completed…
Florida Governmental Utility Authority Board Of Directors Meeting Agenda
Board meeting · Mar 19, 2026
Agenda packet
94 days before RFP
FGUA recorded the 28th Street Water Main Extension in design and pre-bid preparation, with an FDEP grant application proposed as its potential funding source.
28th Street Water Main Extension This project involves the design and construction of approximately 4,850 LF of 10" water main along 28th Street SW and approximately 4,200 of 8" water main along the surrounding streets. The purpose of this project is to provide a potable water transmission main. A grant application is currently in process with FDEP. If…
Florida Governmental Utility Authority Board Of Directors Meeting
Agenda packet · Jul 16, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (31 days left)
Florida Governmental Utility Authority Board Of Directors Meeting Minutes
Board meeting · Jun 19, 2025
Decision makers connected to this RFP from Florida Governmental Utility Authority.
Adjacent opportunities open for bidding right now.
Special DistrictPA
Posted
Sep 23, 2026
Oct 28, 2026
Provide qualified professional consultant engineering firms (engineer) with expertise in designing water main replacement projects.
Northern Kentucky Water District
Special DistrictKY
Posted
-
Jan 31, 2027
The Northern Kentucky Water District is soliciting a construction project to install approximately 3,900 feet of 8-inch and 12-inch ductile-iron water main, appurtenances, and related work. The work runs along Amsterdam Road from Park Road in Fort Wright to Hamilton Road in Park Hills, Kenton County, Kentucky. The official posting says bid documents are not yet available for download.
CityTX
Posted
Oct 13, 2026
Nov 12, 2026
Work includes 2 EA project sign, includes installation and removal, 937 CY excavation, surface de-watering, 376 LF 8' tall precast concrete fence, complete in place, 676 SY remove and dispose of existing pavement and base (all types and depths), includes all saw-cutting required, haul-off and disposal, 1 EA adjust water valve box to grade, complete in place, 1 EA abandoned service drop and pole to be removed, includes haul-off and disposal. See attached file.
CityMA
Posted
Oct 15, 2026
Nov 5, 2026
Water main replacement.