Special DistrictOR
Posted
-
Oct 29, 2026
Parcel 2 Road Extension RFP
Construct approx. 1,870 LF of 24" HDPE DR21 pipe for potable waterline; 1,945 LF of 3" HDPE DR11 pipe for potable waterline; 1,300 CY of Rock to be hammered, removed, and hauled for pipe trenching and installation; 4,300 Tn Supply and Install 3/4"- PG64-28 HMAC per plan. (2) 2" lifts.
