Gwinnett County Public Schools
School DistrictGA
Posted
Sep 15, 2026
Oct 22, 2026
Trip ES - Addition RFP
Construction of school addition.
Description: Work inlcudes new addition includes a heavily reinforced concrete vault encompassing the linear accelerator, outfitted with radiation shielding, new restrooms, exam rooms, nursing stations, work rooms, tech rooms and storage rooms constructed of metal framing and sheetrock.
HigherEducation · AL, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Gwinnett County Public Schools
School DistrictGA
Posted
Sep 15, 2026
Oct 22, 2026
Construction of school addition.
Special DistrictPA
Posted
Sep 29, 2026
Oct 20, 2026
Construction of a 50’-0” x 60’-0” pre-engineered metal building addition to the existing 200’-0” X 100’-0’ Clearly Ahead Development Energy Building located at 509 Spruce St., Clearfield, PA 16830 in Lawrence Township, Clearfield County.
Midland Academy Charter School
SchoolTX
Posted
Oct 6, 2026
Oct 22, 2026
The project consists of a turnkey 40' x 24' x 12' metal-building addition tied into the existing gymnasium. The work includes removal and legal disposal of the existing concrete pad; site and subgrade preparation; installation of a new concrete slab/foundation; furnishing and erection of the metal building; insulation; structural and weatherproof tie-in to the existing gym; electrical; HVAC; required transitions, flashing and related construction; permits and inspections; cleanup; and all labor, supervision, equipment and materials necessary for a complete project.
Massachusetts Convention Center Authority
State AgencyMA
Posted
Sep 23, 2026
Nov 4, 2026
The work consist approx. of structural concrete repairs but are not limited to the main vault room, it also encompasses repairs to the air intake and air exhaust vaults, the exterior surface above all of these vaults at sidewalk level.
Decision makers connected to this RFP from University Of South Alabama.