MACS Gymnasium Addition Project RFP
Posted
Oct 6, 2026
Oct 22, 2026
The project consists of a turnkey 40' x 24' x 12' metal-building addition tied into the existing gymnasium. The work includes removal and legal disposal of the existing concrete pad; site and subgrade preparation; installation of a new concrete slab/foundation; furnishing and erection of the metal building; insulation; structural and weatherproof tie-in to the existing gym; electrical; HVAC; required transitions, flashing and related construction; permits and inspections; cleanup; and all labor, supervision, equipment and materials necessary for a complete project.