CityIL
Aug 14, 2026
Closes
Aug 28, 2026
Sidewalk RFP
Construction of concrete block wall, the filling of existing vault(s) under the sidewalk, and sidewalk at various locations. The proposed improvement consists of the following approx. quantities: 2,032 SF Sidewalk Removal 3082 SF PCC Sidewalk - 5" 42 SF Concrete Block Wall Construction 84 TON Select Aggregate Backfill.