Budget
688 days before RFP
The Metropolitan Council’s final adopted 2025 budget lists $1.1 million for Metro Flood Control Improvements.
See sourceHide source
1 0 32 0 2 5 F I N A L A D O P T E D U N I F I E D B U D G E T METROPOLITAN COUNCIL CAPITAL PROGRAM ENVIRONMENTAL SERVICES TABLE G-2 ($ in 000's) Authorized Capital Program (ACP) Capital Improvement Plan (CIP) 2024 Amended Changes 2025 Adopted 2025 2026 2027 2028 2029 2030 Total ACP + CIP Combined 807871 Seneca Pay Go 1,621 (1,621) - - - - - - - - - 807899…
The adopted ES Capital Program records Metro WRRF Flood Control Improvements to raise the Pig's Eye Lake Road and 5th Avenue intersection to the existing levee height, with construction scheduled for 2027.
See sourceHide source
Metro WRRF Flood Control Improvements Program family 8089 Project #808918 Project location: Council District #13, City of Saint Paul, Metro WRRF Location of the flood control measure at the Metro WRRF Project type Facility Objectives Asset Preservation Scope Increase the road elevation at the intersection of Pig's Eye Lake Road and 5th Avenue to the…
Environmental Services had projects lined up to reassess the Metro Plant flood wall for rising-water protection.
See sourceHide source
And so when we're doing this within ES there's a couple of things that we have been doing that we have been it's been part of our daily work but it's something that I want to make sure that we are clear upon because it is very important. Uh, one part is most of our water resource recovery facilities are right beside large rivers that do have periodic…
Metropolitan Council Meeting
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Underdeck structural and marine improvements. Contract comprises four main project elements: steel caisson protection, sludge barge loading dock fender replacement, underdeck repair and improvements, and ice breaker reconstruction.
The project includes, but is not limited to, facility-wide improvements at the Hilliard N. Fletcher Water Resource Recovery Facility (WRRF), including rehabilitation of the septage receiving station and existing offloading areas; installation of a new packaged septage receiving station; rehabilitation of the existing blower building, including ventilation upgrades and other miscellaneous building improvements; replacement of the existing blower system, including demolition of the existing blowers and electrical equipment and installation of new blowers, associated piping, and electrical equipment; and construction of a new UV disinfection facility. The project is being constructed for the City of Tuscaloosa, which is the awarding authority.
Work consists of 1,400 SF Aeration Basin vertical, horizontal and overhead concrete surface removal and repair: Repair System B; 400 SF Aeration Basin vertical, horizontal and overhead concrete surface removal and repair: Repair System C; 176 LF Aeration Basin Polyurethane Injection Grouting.
Repairs and improvements to the Town of Southbury Animal Control Facility, including flooring, masonry walls and cages, fencing, plumbing, and roofing.