Posted
Nov 2, 2026
Dec 18, 2026
RWRF Lightning & Surge Protection Upgrades RFP
qualified, licensed, and responsible Contractor to complete lightning and surge protection upgrades at Regional Water Reclamation Facility.
Description: Subcontractor bids for multiple scopes on the Medford RWRF project, including electrical, mechanical, concrete, paving, and site work.
City · OR, US
Adjacent opportunities open for bidding right now.
Posted
Nov 2, 2026
Dec 18, 2026
qualified, licensed, and responsible Contractor to complete lightning and surge protection upgrades at Regional Water Reclamation Facility.
CityTX
Posted
Nov 3, 2026
Dec 3, 2026
The project includes a multi-component public infrastructure and park improvement project. Phase 2 (GMP#2) of this project includes: the redevelopment of James Parkway, Puryear Drive, and Francis Drive. - Scope includes (but is not limited to): demolition, milling of existing asphalt, earthwork, subgrade stabilization, SWPPP, traffic control, tree protection, Water/Sanitary/Storm utilities & infrastructure upgrades, concrete paving, concrete curbs, concrete sidewalks, concrete driveways, stamped colored concrete, gravel driveways, asphalt transitions, paving sealants, pavement markings, signage, mailboxes, street lighting & power modifications, landscape/hardscape/irrigation repairs.
CityND
Posted
Nov 5, 2026
Dec 3, 2026
Sealed bids are being solicited for construction work at the Bismarck Water Treatment Plant for the GMP 8 Regional CIDERS Facility. Work is divided into at least two bid packages: a General Contract to install a CMAR‑provided 200‑ton liquid carbon dioxide storage tank with piping, ancillary equipment, and equipment shelter, and an Electrical Contract to install electrical equipment, wiring, and trenching to support pumps, instruments, and monitoring devices. The Construction Manager at Risk (PKG Contracting, Inc.) will receive bids and administer the procurement, with site visits available and technical questions accepted by email and answered only by addenda.
CityMO
Posted
Nov 19, 2026
Dec 2, 2026
David E Ross Construction is the CMAR for the Jacomo Pump Stations Project for the City of Lee's Summit, MO. Ross Construction is accepting bids for early completion packages including 1) Tree Removal, 2)Generator and Transfer Switches, and 3) PVC C900 Pressure Pipe for inclusion in GMP#1. Refer to attachments. Construction Manager at Risk: David E Ross Construction Co 4747 W 135 th St. Suite 100 Leawood, KS 66224 Matt Gustin mgustin@derossconstruction.com and John Gardner jgardner@derossconstruction.com
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of Medford.