Posted
Oct 26, 2026
Nov 12, 2026
Marina Concrete Slab Replacement RFP
Marina concrete slab replacement.
Description: The project consists of all labor, materials, equipment, and services necessary for existing original gymnasium ceiling light fixture assembly to be replaced with new LED light fixtures. Existing circuit breaker will be used to re-feed lights, new wiring and conduit to be provided to allow for a successful installation of branch lighting circuit as well as required lighting controls.
SchoolDistrict · CA, US
From the first pre-RFP signals to the published RFP and its files.
Annual financial report
707 days before RFP
Voters approved Measure A, authorizing up to $790 million for District property work including modernization and core functionality.
On November 5, 2024, San Francisco voters approved the School Facilities Improvement Bond of 2024 (2024 Measure A), authorizing the District to issue bonds in an aggregate principal amount not to exceed $790,000,000 to finance work on the District's properties across key investment categories including modernization, core functionality, student nutritional…
San Francisco Unified School District Audit Report FY2025
Annual financial report · Mar 11, 2026
Annual financial report
545 days before RFP
The District issued $160 million of Series A bonds under Measure A for its facilities programme.
On November 5, 2024, San Francisco voters approved the School Facilities Improvement Bond of 2024 (2024 Measure A), authorizing the District to issue bonds in an aggregate principal amount not to exceed $790,000,000 to finance work on the District's properties across key investment categories including modernization, core functionality, student nutritional…
San Francisco Unified School District Audit Report FY2025
Annual financial report · Mar 11, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (10 days left)
Decision makers connected to this RFP from San Francisco Unified School District.
Adjacent opportunities open for bidding right now.
Posted
Oct 26, 2026
Nov 12, 2026
Marina concrete slab replacement.
CityON
Posted
Oct 9, 2026
Nov 3, 2026
The City of Thunder Bay seeks a contractor to remove existing underground diesel and gasoline storage tanks and install new above-grade 10,000-litre split tanks on a concrete pad with bollards and fencing. Work includes transition sumps, fuel lines to existing docks, replacement fuel dispensers, and replacement electrical power and control wiring and panels. A separate price is requested for a new marine sewage pump and water supply modifications.
Special DistrictWA
Posted
Oct 27, 2026
Nov 24, 2026
PORT OF BREMERTON REQUEST FOR BIDS PROJECT NAME: Port Orchard Marina Breakwater Replacement; Re-Bid PROJECT NO.: 03-15-0224-R ESTIMATED COST: $20,000,000 to $25,000,000 (Incl. WSST) BIDS DUE: November 24, 2026 at 2:00 PM Public notice is hereby given that the PORT of Bremerton has issued a Request for Bids for the above-named project, with electronic bids due no later than the date and time given above. This solicitation is a “Re-Bid” of project 03-15-0224, however, modifications to the former contract documents have been made in numerous parts. No former project 03-15-0224 contract document components, including all former addenda, will be considered applicable to this new request for bids. Bids are to be submitted electronically through https://mrscrosters.bonfirehub.com. Bidders must create a login to submit a bid. The original bid bond hard copy is due to the Port before the bid deadline and is not to be received electronically. Deliver bid bonds labeled with bid opportunity “#03-15-0224-R Port Orchard Marina Breakwater Replacement” to: Attn: Tim Petrick, Port of Bremerton, 8850 SW State Hwy 3, Bremerton, WA 98312. Bids sent via e-mail are not accepted. Questions are due by November 16, 2026 at 5:00 PM and are to be received online the “Q&A” section of the solicitation. Bid prices will be publicly read following the proposal submission deadline at Airport Terminal Conference Room, 8850 SW State Hwy 3, Bremerton, WA 98312. The bid opening will also take place virtually. To participate, join by phone by dialing +1 917-933-5579, Phone conference ID: 666 226 679#. The meeting is also accessible by joining online by visiting https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting with Meeting ID: 222 522 268 073 047 and Passcode: KU3kX2QJ. The Port of Bremerton is seeking bids for a breakwater replacement project at the Port Orchard Marina. This project will include new north and east breakwaters, and may include approach floats, a new gangway, and demolition of the existing structures and utilities. The breakwater, approach floats, and gangways are performance specified for the fabricator's final design. The anchoring system for the floats is fully designed as well as the float utilities. Utility infrastructure includes dock water systems, dock fire systems, sewer forcemain, and electrical. The upland utility work includes temporary erosion and sediment control (TESC); existing utility protection, and site restoration, including paving and landscaping. The project mitigation components may include the demolition of two timber piers located within one mile of the site. To access the bid opportunity, download documents, and view plan holders, visit: https://mrscrosters.bonfirehub.com. For technical support with MRSC Rosters, call 206.625.1300 Ext. 14. For vendor support on electronic bidding, visit https://procurement-help.eunasolutions.com/hc/en-us. Prevailing Wage Provision: The workers of all contractors and subcontractors on all Port "public works" as defined by RCW 39.04.010, shall be paid the "prevailing rate of wage" including "usual benefits" and overtime, paid in the locality as those terms are defined by Chapter 39.12 RCW. The contractor is responsible for obtaining and completing all required government forms and submitting same to the proper authorities. In accordance with RCW 39.12.030, applicable prevailing wage rates can be found online at https://secure.lni.wa.gov/wagelookup/rates/journey-level-rates. Davis-Bacon Act, as amended (40 U.S.C. 3141-3148): In accordance with the statute, contractors must be required to pay wages to laborers and mechanics at a rate not less than the prevailing wages specified in a wage determination made by the Secretary of Labor. In addition, contractors must be required to pay wages not less than once a week. The project is supported with funding from the following: 2023 Federal RAISE Grant (MARAD) - $9,400,000 Washington State 2018 appropriation - $988,430 Washington State 2021 BIG grant (US Dept. of Interior) - $1,200,000 2023 State capital and transportation budgets - $3,000,000 Total Federal Funds = $10,600,000, up 42.4-48.1% of project costs. The PORT in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 U.S.C. §§ 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that for any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. For assistance creating a vendor profile, visit https://procurement-help.eunasolutions.com/hc/en-us/sections/48366912105235-Vendor-Registration. General help and support website: https://procurement-help.eunasolutions.com/hc/en-us
CityFL
Posted
Oct 15, 2026
Nov 23, 2026
Work inlcudes a-dock replacement and d-dock decking replacement. Covers piles, pile caps, cross-bracing, stringers and decking, plus new electrical, potable water, sewer pump-out and fire protection systems and new dock accessories. On d-dock, the existing composite decking is removed and replaced with ipe hardwood decking. All new hardware and fasteners are 316 stainless steel.