University of Massachusetts-Central Office
Higher EducationMA
Posted
Nov 4, 2026
Dec 10, 2026
Residence Hall Damper Replacement -Phase 1
DAMPER REPLACEMENT - PHASE I
Description: DCAMM; general building contract FSB: HVAC.
City · MA, US
Adjacent opportunities open for bidding right now.
University of Massachusetts-Central Office
Higher EducationMA
Posted
Nov 4, 2026
Dec 10, 2026
DAMPER REPLACEMENT - PHASE I
CityUT
Posted
Oct 22, 2026
Nov 19, 2026
The WORK includes the installation of approximately 3,560 linear feet of 12” DR-18 C900 waterline, 6,300 linear feet of 8” waterline, 600 linear feet of 6” DR-18 C900 waterline 53 water service extensions, connecting 16 water service to new main line, installing 56 new water services, installing 33 new fire hydrants, and other utility and roadway improvements.
CityWA
Posted
Oct 22, 2026
Nov 12, 2026
Constructing approx. 10,LF of ductile iron water mains, installing new fire hydrant assemblies, installing replacement water services, constructing two replacement pressure reducing valve (PRV) stations in a concrete vault, construction dewatering, relocating existing utilities (as required), abandoning asbestos cement pipe, restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, performing traffic control, other work as required to complete the project.
CityCO
Posted
Oct 26, 2026
Dec 17, 2026
Works include approx. 69 EA Reconnect Service Line to Water Meter; 1,150 TN Hot Mix Asphalt (Grading SX) (75) (PG 64-22); 1,775 LF of Fence (Plastic) Temporary Construction Fence; 4,100 LF of 8" Plastic Pipe.
Decision makers connected to this RFP from City of Lowell.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.