Description: The WORK includes the installation of approximately 3,560 linear feet of 12” DR-18 C900 waterline, 6,300 linear feet of 8” waterline, 600 linear feet of 6” DR-18 C900 waterline 53 water service extensions, connecting 16 water service to new main line, installing 56 new water services, installing 33 new fire hydrants, and other utility and roadway improvements.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
Installation of approx., 480 LF of twelve-inch (12") and approx., 4,100 LF of eight-inch (8") DIP potable water mains. Work also includes the tie-in connection to existing mains at all intersections. The project also includes service connections, valves, fire hydrants, site restoration, base course paving over trench, and removal of existing mains.
Constructing approx. 10,LF of ductile iron water mains, installing new fire hydrant assemblies, installing replacement water services, constructing two replacement pressure reducing valve (PRV) stations in a concrete vault, construction dewatering, relocating existing utilities (as required), abandoning asbestos cement pipe, restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks, performing traffic control, other work as required to complete the project.
Work includes approx 5,305 LF 4" waterline; 1,000 LF 3/4" water service line; 70 LF 12" steel casing railroad bore; 1,725 SY 2" state road asphalt paving.
Open-cut installation of approx., 16,100 LF of ductile iron water line (12" and smaller diameter), 22 fire hydrant assemblies, 7 blow-off valves, and associated appurtenances.
Key Contacts on this RFP
Decision makers connected to this RFP from City of Orem.
From the first pre-RFP signals to the published RFP and its files.
1 file available
Board meeting
611 days before RFP
Staff identified replacement of 18 miles of undersized water lines and other lines over 75 years old as a high-priority programme component.
See sourceHide source
that after that we would be shifting more into uh we're going to replace aging infrastructure and Target those areas where we know we have we have 18 miles of 4in water lines that need to be replaced because they can't put out a fire so those seem to be a high priority it's not a water tank but it is substantial amount of money that to pay for 18 18 Mi of…
City staff proposed $4.4 million for water master-plan projects including upsizing undersized lines and addressing leaky water lines.
See sourceHide source
water for master plan projects 4.4 million. And then the second item for 50,000 is part of that landscaping project commission. water is going to pay a portion of that piece. And the water master plan projects would include um upsizing existing 4 in and 6 in lines to new 8 inch lines, our standard size. There's a lot of priority areas throughout the city…
Orem City Council's consent agenda included a proposal to approve the utility master plans and associated financial plans; the transcript does not record the outcome.
See sourceHide source
uh on the on the consent agenda uh items today is to finally approve and adopt the master plans for each of our utilities. Presentations have been given to you over the past several months. Um as well as uh on those as well as the rate study and impact
The adopted FY 2025-2026 budget lists $6,183,000 for replacing undersized city water pipelines.
See sourceHide source
Water Capital Projects Requests Itemized Requests for 2026-2031 SW2 - Lakeview Parkway road project pipe $907,000 2650 ft of new pipe associated with the Lakeview Parkway road project SW3 - Geneva Road widening project $738,000 2100 ft of new pipe associated with the Geneva Road widening project System replacement $14,535,000 Per Master Plan. This is to…