CityIL
Posted
Sep 14, 2026
Nov 2, 2026
LEAD SERVICE LINE REPLACEMENT PHASE 11H RFP
The City of Rockford Water Division is soliciting sealed, unit-price bids to replace approximately 400 residential lead service lines using open-cut trenching or directional boring, with old lines abandoned in place after connection. The work requires a 5% bid bond, 100% performance and payment bonds, and compliance with Davis-Bacon, Illinois Works, DBE, Build America/Buy America, prevailing-wage, and apprenticeship requirements, and is partly funded by an Illinois EPA loan. A mandatory pre-bid meeting is scheduled for October 6, 2026, and bids are due by November 2, 2026 at 11:00 AM; the estimated duration is about 120 working days.
