Special DistrictTN
Posted
Sep 14, 2026
Oct 13, 2026
Raw Water Intake Renovation
The project renovates the raw-water intake and replaces the traveling water screen. It also includes replacement of three vertical turbine pumps and installation of new valves, a flowmeter, and a bypass-pump connection. Electrical and storage buildings, along with a horizontally directionally drilled crossing, are part of the work.
