The project renovates the raw-water intake and replaces the traveling water screen. It also includes replacement of three vertical turbine pumps and installation of new valves, a flowmeter, and a bypass-pump connection. Electrical and storage buildings, along with a horizontally directionally drilled crossing, are part of the work.
Buyer Attributes
Key metrics and characteristics
City
The city where this buyer is located.
Lewisburg
County
The county where this buyer is located.
Marshall
Address
Physical address of this buyer.
100 Water Street
Zip Code
Postal code for this buyer's location.
37091
Propensity to Spend
How likely this buyer is to spend on new technology based on operating budget trends.
CautiousAggressive
Higher is better Unlock
AI Adoption Score
How likely this buyer is to adopt new AI technologies.
ConservativeEarly Adopter
Higher is better Unlock
Startup Friendliness
How often this buyer champions startups and early adoption.
Board meetings and strategic plans from Lewisburg Water & Wastewater
Lewisburg Water and Sewer Board Regular Monthly Meeting
Date: Oct 28, 2025Type: Meeting mention
The board reviewed financial statements and September bills, and received operational reports regarding water and sewer service requests, water plant capacity and treatment statistics, and wastewater processing and biosolids disposal. Key projects were updated, including sewer line rerouting at Jackson Trailer Park, waterline valve and severance work at the New Lake, and waterline replacement projects on West Commerce and Belfast-Farmington Road. Additionally, the board approved a resolution to accept a bid from H2O Innovation for Phase 2 design services, subject to review by legal and engineering counsel.
Lewisburg Water and Sewer Board Regular Monthly Meeting
Date: Jun 16, 2026Type: Meeting mention
The board reviewed financial statements and bill payments. Key operational reports included water treatment plant capacity and loss metrics, as well as wastewater treatment flow totals and biosolids processing. Project updates were provided regarding the water line replacement on Belfast-Farmington Road and the sewer line replacement on Ewing Street. The board approved the 2026-2027 budget, while the industrial water letter was deferred. Additionally, maintenance improvements at the New Lake pump house were presented and a board member was recognized for service.
Key Contacts
Public-sector contacts connected to Lewisburg Water & Wastewater.
Lewisburg Water and Sewer Board Regular Monthly Meeting
Date: Mar 17, 2026Type: Meeting mention
The board discussed financial statements, operational reports for water and wastewater plants, and project updates, specifically the replacement of a water line on Belfast-Farmington Road. Recognition was given to a long-serving employee, and the department received a surplus dewatering press. Additionally, the board reviewed a payment from a developer for lift station upgrades and accepted a letter of resignation from a board member.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Lewisburg Water & Wastewater meetings, strategic plans, and budget discussions before the public bid appears.