Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Bell County Water Control And Improvement District 1
Archer Western Construction, serving as CMAR, is soliciting bids for Bid Package 8 (Plant 3 Construction) under the Lake Belton Water Treatment Plant Expansion and Improvements Project in Bell County, Texas. The scope includes civil site work, structural elements such as rapid‑mix and flocculation basins, and mechanical equipment including flocculators, inclined plate settlers, and sludge collection systems, with electrical and I&C in a separate package. A pre‑bid meeting is scheduled for February 24, 2026, and bids are due March 17, 2026 at 2:00 PM Central, to be submitted to Bell County WCID No. 1.
Posted Date
-
Due Date
Mar 17, 2026
Bell County Water Control And Improvement District 1
Close: Mar 17, 2026
Archer Western Construction, serving as CMAR, is soliciting bids for Bid Package 8 (Plant 3 Construction) under the Lake Belton Water Treatment Plant Expansion and Improvements Project in Bell County, Texas. The scope includes civil site work, structural elements such as rapid‑mix and flocculation basins, and mechanical equipment including flocculators, inclined plate settlers, and sludge collection systems, with electrical and I&C in a separate package. A pre‑bid meeting is scheduled for February 24, 2026, and bids are due March 17, 2026 at 2:00 PM Central, to be submitted to Bell County WCID No. 1.
AvailableBell County Water Control And Improvement District 1
Work includes demolition of existing surface aerators and construction of coarse bubble diffuser system in the existing aerated sludge tanks. This includes the addition of four multistage centrifugal. Convert two of the four existing traveling bridge sand filters to cloth media filters. Replace one sluice gate and replace one weir at the existing chlorine contact basins. Assoted pavement repair within the wastewater treatment plant site. Replace transformers, switchgear, motor control centers, and other equipment at the main plant electrical building.
Posted Date
-
Due Date
Jul 18, 2025
Bell County Water Control And Improvement District 1
Close: Jul 18, 2025
Work includes demolition of existing surface aerators and construction of coarse bubble diffuser system in the existing aerated sludge tanks. This includes the addition of four multistage centrifugal. Convert two of the four existing traveling bridge sand filters to cloth media filters. Replace one sluice gate and replace one weir at the existing chlorine contact basins. Assoted pavement repair within the wastewater treatment plant site. Replace transformers, switchgear, motor control centers, and other equipment at the main plant electrical building.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Board meetings and strategic plans from Bell County Water Control And Improvement District 1
The Bell County Water Control & Improvement District #1's Water Conservation Plan serves as a roadmap for responsible water management. It outlines objectives to extend the life of current water supplies and infrastructure, reduce per capita water consumption, and improve water use efficiency. Specific targets include reducing unaccounted-for water below 2% and encouraging civilian customers to reduce per capita water usage to 110 gallons per day by 2029 and 104 gallons per day by 2034. The plan emphasizes proper stewardship, waste avoidance, cost savings, and ensuring the adequacy of water supply for the District and its customers.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Bell County Water Control And Improvement District 1's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database