Fresno Unified School District
School DistrictCA
Posted
Nov 16, 2026
Dec 15, 2026
Kirk Elementary School Chiller Replacement RFP
Chiller replacement work.
Description: The District is procuring replacement of one owner-furnished chiller, three pumps, and one buffer tank, including hydronic piping and controls at Kirk Elementary School. The scope includes mechanical equipment installation, associated controls and hydronic piping work. The project requires completion within 49 calendar days, a valid Class C-20 contractor license, and has a 3% DVBE participation goal.
SchoolDistrict · CA, US
Adjacent opportunities open for bidding right now.
Fresno Unified School District
School DistrictCA
Posted
Nov 16, 2026
Dec 15, 2026
Chiller replacement work.
School DistrictSD
Posted
Oct 29, 2026
Nov 24, 2026
Remove and dispose of existing chiller. Modify existing concrete pad: form, pour, and finish extensions to support the new chiller. Regrade the surrounding area for proper access and drain. Minor Fencing modifications. Furnish, and install new air-cooled chiller. Connect all piping between chiller and building; provide required glycol fill and flush per specification. Insulate all new and modified piping and insulate pumps per specifications. Perform hydronic system testing, balancing, and commissioning; provide written test results. Remove the existing CW pump. Relocate pump to new location and add an N+1 CW pump for system redundancy. Install new 4" concrete maintenance pad for both pumps, coordinated with structural requirements. Provide and install two new Variable Frequency Drives (VFDs) for CW pumps. Integrate, program, and commission VFDs for lead/lag operation. Connect, support, and insulate all required piping related to pump installation and other Work indicated in the drawings and specifications.
Higher EducationGA
Posted
Nov 4, 2026
Dec 3, 2026
Gordon State College is seeking bids from qualified contractors for the Chiller replacement at Lambdin Hall on GSC campus. Please see attached Invitation to Bid for more information. A mandatory pre-bid meeting will be held at the Facilities conference room, 419 College Dr. Barnesvillle, GA on Thursday, November 12, 2026, at 10:00 am. All contractors interested in submitting a bid must have a representative at this meeting. GSC Facilities building conference room is located in building number 5 on the attached campus map.
Skagit County Public Hospital District 1
Special DistrictWA
Posted
Nov 3, 2026
Dec 4, 2026
Project involves the replacement of an exisiting air cooled chilled water chiller using r-22 refrigerant with a new water-cooled chiller, a new primary chiller pump, a new condenser water pump, and the replacement of two existing secondary pumps. System improvements also include refurbishment of an existing rooftop exhaust fan to be used for refriderant exhaust, improvements to the main piping distribution system, and upgrades to the building automation system (bas).
Decision makers connected to this RFP from Fresno Unified School District.
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File Retrieval