Closing soon

Georgia Morse Middle School Chiller Replacement RFP

Description: Remove and dispose of existing chiller. Modify existing concrete pad: form, pour, and finish extensions to support the new chiller. Regrade the surrounding area for proper access and drain. Minor Fencing modifications. Furnish, and install new air-cooled chiller. Connect all piping between chiller and building; provide required glycol fill and flush per specification. Insulate all new and modified piping and insulate pumps per specifications. Perform hydronic system testing, balancing, and commissioning; provide written test results. Remove the existing CW pump. Relocate pump to new location and add an N+1 CW pump for system redundancy. Install new 4" concrete maintenance pad for both pumps, coordinated with structural requirements. Provide and install two new Variable Frequency Drives (VFDs) for CW pumps. Integrate, program, and commission VFDs for lead/lag operation. Connect, support, and insulate all required piping related to pump installation and other Work indicated in the drawings and specifications.

Buyer
Pierre School District 32-2

SchoolDistrict · SD, US

Released
Oct 29, 2026
Closes
Nov 24, 2026(10 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts