Sucrose Drive WWTP Headworks Odor Control Addition RFP
WWTP Headworks Odor Control Addition.
Description: New wastewater headworks with mechanical bar screen. Including LS V-Notch Weir and Ultrasonic Level Meter; LS Stainless Steel Manual Bar Screen; 1 LS Mechanical Bar Screen, Washer Compactor, and Controls; 1 LS Aluminum Railing and Grating; 1 LS Electrical / SCADA; 8 SY Asphalt Repair; 1 ea Precast Concrete Safety End Treatment; 30 LF of 12" Corrugated Metal Pipe; 1 ea Precast Concrete Storm Drain Catch Basin.
City · OK, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
The Kingfisher Public Works Authority approved a resolution authorizing up to $5,000,000 in Oklahoma Water Resources Board financing for water and sewer projects.
Action: B. Discussion and possible action to approve Resolution No. 2025-003 of The Kingfisher Public Works Authority (the "Borrower") authorizing a loan from the Oklahoma Water Resources Board in the total aggregate principal amount of not to exceed $5,000,000.00; approving the issuance of a promissory note in the total aggregate principal amount of not to…
Kingfisher Public Works Authority Special Meeting
Board meeting · Sep 29, 2025
Board meeting
The Kingfisher Public Works Authority approved going out to bid for the Sewer plant Headworks Project.
B. Discussion and possible action to go out to bid for the Sewer plant Headworks Project. Travis Archer Motion to approve to go out to bid for the Sewer plant Headworks Project. Moved by: Jeremie Hill; seconded by: Jeff Wittrock Aye: Geoff Covalt, Jeff Wittrock, Daniel Ruhl, and Jeremie Hill Not Present at Vote: Kyle Mecklenburg Motion Passed 4-0
Kingfisher Public Works Authority Special Meeting
Board meeting · Oct 5, 2026
RFP published
Proposals due (22 days left)
B. Discussion and possible action to go out to bid for the Sewer plant Headworks Project. Travis Archer
Kingfisher Public Works Authority Special Meeting
Agenda packet · Oct 5, 2026
Decision makers connected to this RFP from City of Kingfisher.
Adjacent opportunities open for bidding right now.
CityLA
Posted
Oct 20, 2026
Oct 30, 2026
WWTP Headworks Odor Control Addition.
North Jersey District Water Supply Commission (NJDWSC)
Special DistrictNJ
Posted
Oct 7, 2026
Dec 15, 2026
Headworks Cascade Fountain Repair.
CityCA
Posted
-
Nov 3, 2026
P/N: 1415827 | QTY: 1 - GF10000PW floating, AC powered circulation equipment with chemical injection assembly, high-torque direct-drive brushless DC motor, digital control system converts AC to low voltage DC, four SCADA outputs. Requires 120VAC/60Hz 15 amp service SHALL INCLUDE THE FOLLOWING: P/N: 101748 | QTY: 1 - PW Hose Assembly, 36" X 20', Includes Flanges, Clamps & Chain P/N: 101750 | QTY: 1 - PW Hose Assembly, 36" X 10', Includes Flanges, Clamps & Chain P/N: 102050 | QTY: 1 - Potable Water Dual Tether Anchor Kit P/N: 10014018 | QTY: 82 FEET - Stainless Steel Tether Cable, P/N: 1415382 | QTY: 50 FEET - Electrical Cable, P/N: 4401175 | Crate for Large GridBee Mixer.
CityCA
Posted
Oct 14, 2026
Nov 4, 2026
The project includes the following work: installation of a 24" tie-in with a blind flange and thrust block on the existing 36" wastewater influent pipeline and backfilling the excavation. Procurement and delivery of one 24" eccentric plug valve and one 36-inch eccentric plug valve to the project site. Installation of a shoring box, a 1" steel plate bolted to the outside of channel, and a galvanized chain link fencing inside the channel, and a 1" a36 steel plate and hydrophilic waterstop.