Headworks Rehabilitation and Improvement Project - Phase 1A RFP
Posted
Oct 14, 2026
Nov 4, 2026
The project includes the following work: installation of a 24" tie-in with a blind flange and thrust block on the existing 36" wastewater influent pipeline and backfilling the excavation. Procurement and delivery of one 24" eccentric plug valve and one 36-inch eccentric plug valve to the project site. Installation of a shoring box, a 1" steel plate bolted to the outside of channel, and a galvanized chain link fencing inside the channel, and a 1" a36 steel plate and hydrophilic waterstop.