Northeast Ohio Regional Sewer District
Special DistrictOH
Posted
Sep 22, 2026
Oct 23, 2026
Easterly Headworks Bar Rake and Bar Screen Rehabilitation Project RFP
Easterly headworks bar rake and bar screen rehabilitation project.
Description: The project includes the following work: installation of a 24" tie-in with a blind flange and thrust block on the existing 36" wastewater influent pipeline and backfilling the excavation. Procurement and delivery of one 24" eccentric plug valve and one 36-inch eccentric plug valve to the project site. Installation of a shoring box, a 1" steel plate bolted to the outside of channel, and a galvanized chain link fencing inside the channel, and a 1" a36 steel plate and hydrophilic waterstop.
City · CA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Northeast Ohio Regional Sewer District
Special DistrictOH
Posted
Sep 22, 2026
Oct 23, 2026
Easterly headworks bar rake and bar screen rehabilitation project.
CityAZ
Posted
Oct 13, 2026
Nov 19, 2026
Work includes 2,146 CY earthwork excavation (mag 205); 1,348 CY surplus material (mag 205); 1,331 SY subgrade preparation (mag 301), 8" scarify and recompact; 407 SY subgrade preparation (mag 301), 6" under curb, sidewalk, and ramps; 238 ton 3" ac, mag 3/4" mix, single lift (mag 321); 222 CY abc, 6" pavement section (mag 310 & 702-1); 45 CY abc, 4" under curb, sidewalk, and ramps (mag 310 & 702-1); 3,378 SF sidewalk and ramps (mag 340); 554 sf 3' valley gutter (mag 340); 559 LF 6" single curb, mag 222, (mag 340); 4 EA curb and gutter transition, qcsd 221q (mag 340). See attached file.
CityGA
Posted
Sep 24, 2026
Oct 29, 2026
Walnut street improvement project phase 2. Phase 2 of the current project includes improvements to walnut street. Improvements include, new sidewalks, new lane patterns, two bike lanes, and crossing walks. No infrastructure improvements are proposed. All existing stormwater infrastructure, sanitary sewer infrastructure, and drinking water shall remain in place.
CityGA
Posted
-
Oct 19, 2026
Work involves excavating and grading portions of an existing inline storm water pond, improving drainage channels and coordinating construction with a developer's contractor for the adjacent phase 2b work.
Decision makers connected to this RFP from City of Pacifica.