CountySC
Posted
Aug 20, 2026
Sep 22, 2026
Fairfield CTC 2027 State Road Paving Project (Phase 2 -99 Road)
Work includes hma paving and miscellaneous related items that also includes 100 SY h/m asph full depth patch (6" uniform); 27,778 SY h/m asph surf cr. Type c (liquid included) 175 #/SY; 1,025 SY h/m asph surf cr type c (liquid included) 220 #/sy drives; 50 LF 24" wh sld line - stop/dia - fd pnt; 24 LF 24" wh sld line - thermo 125 mil; 534 SY variable milling. See attached file.