CityOK
Posted
-
Nov 20, 2026
Kingfi sher WWTP New Headworks RFP
New wastewater headworks with mechanical bar screen. Including LS V-Notch Weir and Ultrasonic Level Meter; LS Stainless Steel Manual Bar Screen; 1 LS Mechanical Bar Screen, Washer Compactor, and Controls; 1 LS Aluminum Railing and Grating; 1 LS Electrical / SCADA; 8 SY Asphalt Repair; 1 ea Precast Concrete Safety End Treatment; 30 LF of 12" Corrugated Metal Pipe; 1 ea Precast Concrete Storm Drain Catch Basin.
